{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002470,"name":"Drainage plan","dataset":"planning-condition","typology":"policy","reference":"U0119221","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interest of satisfactory and sustainable drainage.","description":"The development shall be carried out in accordance with the details shown on the submitted plan, 'Drainage Plan 13130 103 (revision A) dated 15/11/2021 that has been prepared by Bayham Meikle, unless otherwise agreed in writing with the Local Planning Authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002471,"name":"contamination","dataset":"planning-condition","typology":"policy","reference":"U0119222","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To secure the satisfactory development of the site in terms of human health and the wider environment, in accordance with the National Planning Policy Framework and Doncaster's Local Plan Policy 54 & 55.","description":"b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002472,"name":"BREEAM","dataset":"planning-condition","typology":"policy","reference":"U0119223","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of sustainability and to minimise the impact of the development on the effects of climate change.","description":"Unless otherwise agreed, the development must take place in accordance with the approved BREEAM Pre-Assessment assessment (AES document dated 13th December 2021- received: 8th September 2022). Within 6 months of any building being occupied, a post construction review should be carried out by a licensed assessor and submitted for approval. This will enable the planning condition to be fully discharged."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002473,"name":"interceptors","dataset":"planning-condition","typology":"policy","reference":"U0119224","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To avoid pollution of the public sewer and land drainage system.","description":"The development hereby permitted shall be carried out in accordance with the 'Drainage Plan' (DWG no103 C) 'Drainage Construction Details' (DWG no 107) and 'Flood Routing Plan' (DWG no105 B) submitted and approved under planning application reference 23/00802/COND. All surface water run-off from the site, except roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002474,"name":"Plans","dataset":"planning-condition","typology":"policy","reference":"U0119231","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: 2AllertonSt_Plans_V2 Pre Existing Plans 2AllertonSt_ExistingBlockPlan_V2 Existing Block Plan"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002475,"name":"In accordance with specified plans","dataset":"planning-condition","typology":"policy","reference":"U0119253","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 3957-02 - Existing and Proposed Plans, drawing no. 3957-01B"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002476,"name":"Expiration date","dataset":"planning-condition","typology":"policy","reference":"U0119277","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"Condition required to be imposed by Section 91(as amended) of the Town and Country Planning Act 1990.","description":"The development to which this permission relates must be begun no later than 24 May 2026."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002477,"name":"Approved plans","dataset":"planning-condition","typology":"policy","reference":"U0119278","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development is carried out in accordance with the application as approved.","description":"The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan, Drg No: DON407/SP/A/2002, Received: 12/1/2023 Proposed Plans- Proposed Filter Plant Drawings, Drg No: DON407/FU/A/7004 Rev B, Received: 20/11/2023 Proposed Plans- Proposed Extension Elevations, Drg No: DON407-BL-A-1007, Received: 12/1/2023 Proposed Plans- Extension, Drg No: 12948 - P1, Received: 12/1/2023 Proposed Plans- Chimney Elevations, Drawing No: 223-1-1, Rev: E, Received: 17/5/2023 Proposed Plans- Chimney Sections, Dwg No: 22065-DL-250-0006, Received: 17/5/2023"},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002478,"name":"External materials and finishes","dataset":"planning-condition","typology":"policy","reference":"U0119279","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the satisfactory appearance of the development in accordance with policy 41 of the Doncaster Local Plan.","description":"The external materials and finishes shall match the existing property."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002479,"name":"Construction Traffic Management Plan","dataset":"planning-condition","typology":"policy","reference":"U0119280","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To safeguard the living conditions of neighbouring residents and in the interests of highway safety in accordance with Local Plan Policy 13.","description":"The development shall be carried out in accordance with the Construction Traffic Management Plan approved by the local planning authority on 13 November 2023 under reference 23/02081/COND."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2480&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2460&limit=10"},"count":5605}