{"entities":[{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002450,"name":"Watercourse/culvert","dataset":"planning-condition","typology":"policy","reference":"U0119201","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate access at all times and to protect the culvert from damage.","description":"No building shall be erected within 10 metres of the watercourse or culvert, which passes through/runs adjacent to the site."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002451,"name":"sw run off","dataset":"planning-condition","typology":"policy","reference":"U0119202","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To avoid pollution of the public sewer and land drainage system.","description":"All surface water run-off from the site, except roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002452,"name":"Drainage","dataset":"planning-condition","typology":"policy","reference":"U0119203","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure the drainage apparatus of the site is adequately maintained for the lifetime of the development and to accord with para. 173 of the NPPF.","description":"Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002453,"name":"soft landscaping","dataset":"planning-condition","typology":"policy","reference":"U0119204","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"In the interests of environmental quality and in accordance with Policy 48 of the Local Plan.","description":"Unless as shall be specifically approved in writing by the Local Planning Authority, the scheme of soft landscaping shall be implemented in full accordance with the approved plans and particulars (ref. PRC Landscape General Arrangement Plans sheets 1-4; Job No. 11383 Stage/Drawing Nos. PL_005 C, PL_006 C, PL_007 C and PL_008 C; Received: 09/11/2023) during the first available planting season following the completion of the development hereby granted and the local planning authority notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion in writing. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002454,"name":"flood risk assessment","dataset":"planning-condition","typology":"policy","reference":"U0119205","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To reduce the risk of flooding to the proposed development and future occupants.","description":"The development shall be carried out in accordance with the submitted flood risk assessment produced by Baynham Meikle Partnership Limited dated 13 December 2021, reference 13130-APB-FRA-30.04.21, Revision 1.1, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 10.23 metres above Ordnance Datum (AOD) The mitigation measure shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002455,"name":"remediation","dataset":"planning-condition","typology":"policy","reference":"U0119206","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not contribute to, and is not put at unacceptable risk from or adversely affected by, unacceptable levels of water pollution in line with para. 189 of the National Planning Policy Framework.","description":"The development hereby permitted shall be carried out in accordance with the following revised reports: o Former Croda Works, Doncaster, Outline Options Appraisal, by Wardell Armstrong, dated July 2022, Reference LD10404, Report No. 003 V0.3 o Former Croda Works, Doncaster, Remediation Strategy, by Wardell Armstrong, dated September 2022, Reference LD10404, Report No. 004 V0.3 o Premier Park, Wheatley (Former Croda Site) - Verification Plan, by Base Build Services Ltd, dated May 2023, Document version 3 submitted and approved under planning application reference 23/00796/COND."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002456,"name":"verification report","dataset":"planning-condition","typology":"policy","reference":"U0119207","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the site does not pose any further risk to the water environment by demonstrating that the requirements of the approved verification plan have been met and that remediation of the site is complete. This is in line with paragraph 174 of the National Planning Policy Framework.","description":"Prior to any part of the permitted development being brought into use, a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to, and approved in writing, by the local planning authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002457,"name":"drainage systems","dataset":"planning-condition","typology":"policy","reference":"U0119208","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure that the development does not contribute to and is not put at unacceptable risk from or adversely affected by unacceptable levels of water pollution caused by mobilised contaminants. This is in line with paragraph 174 of the National Planning Policy Framework.","description":"No drainage systems for the infiltration of surface water to the ground are permitted other than with the written consent of the local planning authority. Any proposals for such systems must be supported by an assessment of the risks to controlled waters. The development shall be carried out in accordance with the approved details."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002458,"name":"vehicle surfacing","dataset":"planning-condition","typology":"policy","reference":"U0119209","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To ensure adequate provision for the disposal of surface water and ensure that the use of the land will not give rise to mud hazards at entrance/exit points in the interests of public safety.","description":"Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority."},{"entry-date":"2025-06-21","start-date":"","end-date":"","entity":73002459,"name":"turning space","dataset":"planning-condition","typology":"policy","reference":"U0119210","prefix":"planning-condition","organisation-entity":109,"geometry":"","point":"","quality":"authoritative","notes":"Unique Condition","reason":"To avoid the necessity of vehicles reversing on to or from the highway and creating a highway hazard.","description":"The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such."}],"links":{"first":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&limit=10","last":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=5600&limit=10","next":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2460&limit=10","prev":"http://www.planning.data.gov.uk/entity.json?dataset=planning-condition&offset=2440&limit=10"},"count":5605}