Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

5,605 results

  • EA 4

    Policy

    Within one month of the date of this permission, a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted shall be submitted for approval in writing by the Local Planning Authority. This strategy shall include the following components; 1) A preliminary risk assessment which has identfiied: a) all previous uses b) potential contaminants associated with those uses c) a conceptual model of the site indicating sources, pathways and receptors d) potentially unacceptable risks arising from contamination at the site 2) A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site. 3) the results of the site investigation and detailed risk assessment referred to in (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they will be undertaken. 4) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete and identifying and requirements for longer term monitoring of pollutant linkages, maintenance and arrangements for contingency action Any changes to these components require the writtedn consent of the Local Planning Authority. The scheme shall be implemented as approved.

    Reference
    U0111960
  • EA 5

    Policy

    Prior to any part of the permitted development being brought into use, a verification report demonstrating the completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved in writing by the Local Planning Authority. The report shall include sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met.

    Reference
    U0111961
  • EA 6

    Policy

    If, during development, contamination not previously identified is found to be present at the site, then no further development (unless otherwise agreed in writing by the Local Planning Authority) shall be carried out until a remediation strategy detailing how this contamination will be dealt with has been submitted to and approved in writing by the Local Planning Authority. The remediation strategy shall be implemented as approved.

    Reference
    U0111962
  • Approved Plans

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location plan. Date received: 20/06/2023. Site plan (amended plan). Date received: 24/07/2023. Street scenes. Sheet 6. Revision A. Date received: 24/07/2023. Proposed elevations. Sheet D (12). Date received: 20/06/2023. Proposed floor plans. Sheet 3. Date received: 02/06/2023.

    Reference
    U0111966
  • Amended plans

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended/approved plans referenced and dated as follows: Amended plans: Proposed Plans. Date: Feb 23. Drawing No: 23-020-4. Revision: A. Received by City of Doncaster Council on the 14.07.2023. Approved plans: Site Plan (Proposed Site Plan at a scale of 1:500). Date: Feb 23. Drawing No: 23-020-2. Received by City of Doncaster Council on the 01.03.2023.

    Reference
    U0111970
  • PLANS

    Policy

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed Plans - Drawing No: 23-029-4, Rev: A, Received: 21/7/2023 Site Plan - Drawing No: 23-029-2, Rev: B, Received 21/7/2023 Proposed Plans (Garden Room) - Drawing No: 23-023-5, Received: 4/6/2023 Location Plan - Drawing No: 22-070-1, Received: 3/4/2023

    Reference
    U0111984
  • OBSCURE GLAZING

    Policy

    Before the first occupation of the building/extension hereby permitted, the en-suite windows as indicated on the approved plans shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.

    Reference
    U0111985
  • FENCE REPLACED IN 3 MONTHS

    Policy

    The existing boundary fence must be removed and replaced with the fence hereby approved as shown on approved plan: Site Plan - Drawing No: 23-029-2, Rev: B. All works to remove the existing fence and install the replacement boundary treatment must be completed within 3 months of this decision date.

    Reference
    U0111986
  • OUTBUILDING ANCILLARY ONLY

    Policy

    The outbuilding hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the main dwelling.

    Reference
    U0111987
  • Approved Plans

    Policy

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location plan (amended plan). Date received: 08/06/2023. Proposed plans (proposed signage). Date received: 26/04/2023.

    Reference
    U0111989