Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0111382Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site Plan as Proposed (001) - Elevations as Proposed (002) - Site Location Plan (103 Rev A) (received 11 July 2023)
- Dataset
- Planning condition
- Reference
- U0111382
-
Policy
U0111383CEMP
No development shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning authority to understand the impact of planning permission on the Sherwood sandstone bedrock principal aquifer. The development shall be carried out in accordance with the CEMP once approved.
- Dataset
- Planning condition
- Reference
- U0111383
-
Policy
U0111384Liquid Storage Tanks
Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks.
- Dataset
- Planning condition
- Reference
- U0111384
-
Policy
U0111385Surface Water
Surface water run-off from the areas used for the battery storage, areas used for and immediately adjacent to battery storage facilities and/or other similar shall not discharge to any public surface water sewer network. Surface water from such areas must pass through a chemical interceptor/separator of adequate design that has been submitted to and approved by the Local Planning Authority, before discharge to the public sewer network.
- Dataset
- Planning condition
- Reference
- U0111385
-
Policy
U0111386Piped Discharge
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via watercourse is not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.
- Dataset
- Planning condition
- Reference
- U0111386
-
Policy
U0111387Drainage DA01
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0111387
-
Policy
U0111394Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0111394
-
Policy
U0111395Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Floor Plans as Proposed (004) (rev A) (received 11 July 2023) - Site Plan as Proposed (005) - Elevations and Proposed (No Changes) (006) - Site Location Plan (007)
- Dataset
- Planning condition
- Reference
- U0111395
-
Policy
U0111400Amended plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Existing plans including location plan; Drawing no. 23010-001; Received 15/05/2023 Proposed plans including site plan; Drawing no. 23010-002; Revision A; Amended 07/07/2023; Received 07/07/2023
- Dataset
- Planning condition
- Reference
- U0111400
-
Policy
U0111401Flat roof
The flat roof, which will be created as a result of the development hereby granted, shall not be used at any time as a roof garden, terrace, patio or similar amenity area.
- Dataset
- Planning condition
- Reference
- U0111401