Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0111260In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Application forms - Location Plan, drawing no. DON-POR-001-P, Revision C - Site Plan (Buildings 1, 2 and 5), drawing no. DON-POR-003-P, Revision B - Site Plan (Buildings 3 and 4), drawing no. DON-POR-02-P, Revision A - Site Plan (Building 6), drawing no. DON-POR-004-P, Revision B - Two-storey building: proposed ground floor plan, drawing no. 00-0100, Revision P05 - Two storey building: proposed first floor plan, drawing no. 00-0101, Revision P05 - Two storey building: proposed elevations, drawing no. 00-0200, Revision P06 - Replacement Shop Building: proposed ground floor plan, drawing no. 00-0100, Revision P02 - Replacement Shop Building: proposed elevations, drawing no. 00-0200, Revision P01 - Design and Access Statement Revision A, dated 5th May 2023 - Proposed Foul and Surface Water Drainage Layout, drawing no. 23071-AJF-ZZ-ZZ-DR-D-001, Revision 1 - Drainage Specification: 2 storey shop and training facility, doc no. 23071-AJF-ZZ-ZZ-SP-D-002 - Drainage Works: Designer's Risk Assessment, doc no. 23071-AJF-ZZ-ZZ-HS-D-001 - Proposed Foul and Surface Water Network: Storm Network, pages 1-8, dated 1st June 2023 - Drainage Standard Details - Sheet 1, drawing no. 23071-AJF-ZZ-ZZ-DR-D-003, Revision 1 - Drainage Standard Details - Sheet 2, drawing no. 23071-AJF-ZZ-ZZ-DR-D-004, Revision 1 - Drainage Standard Details - Sheet 3, drawing no. 23071-AJF-ZZ-ZZ-DR-D-005, Revision 1 - Drainage Standard Details - Sheet 4, drawing no. 23071-AJF-ZZ-ZZ-DR-D-006, Revision 1 - Proposed Drainage - Manhole Schedules (Foul and Surface Water), drawing no. 23071-AJF-ZZ-ZZ-DR-D-008, Revision 1
- Dataset
- Planning condition
- Reference
- U0111260
-
Policy
U0111261DA01 - single storey building only
The development of the single-storey modular building hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0111261
-
Policy
U0111262YW - No SW piped discharge
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.
- Dataset
- Planning condition
- Reference
- U0111262
-
Policy
U0111263YW - separate systems
The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed.
- Dataset
- Planning condition
- Reference
- U0111263
-
Policy
U0111265amended plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: LOCATION PLAN L0160/110 Rev B Received 08.03.2023 BLOCK PLAN L0106/111 Rev E Received 03.07.2023 SITE LAYOUT PLAN AS PROPOSED Ref: L0106/20:10 Rev E Received 08.03.2023 PLANS, ELEVATIONS, SECTIONS AS PROPOSED L0106/20:11 Rev G Received 03.07.2023 Preliminary Ecological Appraisal and Biodiversity Net Gain Assessment November 2021 Received 08.03.2023 Landscape Establishment and Management Plan Rev A, February 2022. Received 08.03.2023
- Dataset
- Planning condition
- Reference
- U0111265
-
Policy
U0111266Agri use only
The building/buildings and curtilage development hereby approved by this permission shall only be used for agricultural and hydroponics related uses and for associated agricultural machinery storage.
- Dataset
- Planning condition
- Reference
- U0111266
-
Policy
U0111267importation
Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.
- Dataset
- Planning condition
- Reference
- U0111267
-
Policy
U0111268drainage
The site shall be developed with separate systems of drainage for foul and surface water on and off site.
- Dataset
- Planning condition
- Reference
- U0111268
-
Policy
U0111269surface water
No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage , for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority .
- Dataset
- Planning condition
- Reference
- U0111269
-
Policy
U0111270Landscape management Plan
The planting scheme detailed in Landscape Establishment and Management Plan Rev A (resubmitted 08.03.2023) and illustrated on Fig 1 - Landscape Proposal dated February 2022 hereby approved in writing by the Local Planning Authority, shall be implemented in the first available planting season after occupation of the development. The Local Planning Authority shall be notified in writing within 7 working days of completion of the landscape works to the required standard detailed in the approved documents and the completion shall be subsequently approved in writing by the Local Planning Authority. The approved scheme shall be maintained for a minimum of five years in accordance with BS 8545:2014 Trees: from nursery to independence in the landscape - Recommendations and yearly management and monitoring schedules within Landscape Establishment and Management Plan Rev A (resubmitted 08.03.2023) dated February 2022. Any landscape which is defective, damaged or removed within five years of establishment shall be replaced.
- Dataset
- Planning condition
- Reference
- U0111270