U0110695Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Proposed Elevations and Floor Plans (022/057/PPE/1) (received 03 April 2023) - Site Plan (022/057/SP/2/RevC) (received 22 May 2023) - Location Plan (022/057/SP/2/A) (received 03 April 2023)
- Dataset
- Planning condition
- Reference
- U0110695
-
Policy
U0110696FRA Compliance
The development shall be carried out in accordance with the submitted flood risk assessment by J Roberts Design Ltd, reference 3888 Rev A dated May 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.9 metres above Ordnance Datum (mAOD) - Critical infrastructure will be raised to a minimum of 5.3m AOD - Appendix G Flood Warning and Evacuation Plan These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0110696
-
Policy
U0110697CTMP
No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i. Site compound area and parking of vehicles for site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding v. wheel washing facilities vi. measures to control noise and the emission of dust and dirt during construction vii. a scheme for recycling/disposing of waste resulting from demolition and construction works
- Dataset
- Planning condition
- Reference
- U0110697
-
Policy
U0110698Contamination
Prior to the occupation of the development, a Phase 4 verification report shall be submitted to and approved by the Local Planning Authority (LPA). The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any sampling and analysis shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0110698
-
Policy
U0110699Landscaping / Ecology Scheme
No above ground works shall take place on the site until details of a landscaping / planting scheme have been agreed in writing with the Local Planning Authority. This scheme is to provide details of species, siting, planting distances and programme of planting. Planting is to be carried out during the first available season after commencement of development and shall thereafter be maintained. Any tree or shrub planted as part of the scheme which is removed or severely damaged or is found to be dying or seriously diseased within five years of planting shall be replaced within the next available planting season with a tree or shrub of a similar size and species.
- Dataset
- Planning condition
- Reference
- U0110699
-
Policy
U0110700Drainage DA01
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. The site shall be developed with separate systems of drainage for foul and surface water on and off site. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0110700
-
Policy
U0110701Piped Discharge
No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0110701
-
Policy
U0110702Amended/approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the amended/approved plans listed below: Amended plans: Title: 15, School Lane, Stainton, S66 7QX (Proposed Site Plan showing 2 number on-site car parking bays added). Rev: A. Received by City of Doncaster Council on the 31.05.2023. Drawing Title: Proposed Ground Floor Plan. Drawing No: 03. Received by City of Doncaster Council on the 31.05.2023. Drawing Title: Proposed Elevations. Drawing No: 05. Rev: C. Received by City of Doncaster Council on the 22.06.2023. Drawing Title: Proposed First Floor Plan. Drawing No: 04. Rev: B. Received by City of Doncaster Council on the 22.06.2023.
- Dataset
- Planning condition
- Reference
- U0110702
-
Policy
U0110723Accordance with Plans Specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans: HLAD_DR_03-303_Rev C, as received 20/06/2023 Site and Location Plans: HLAD_DR_03-301_Rev A, as received 24/04/2023
- Dataset
- Planning condition
- Reference
- U0110723
-
Policy
U0110724Matching materials
The external materials and finishes shall match the existing property unless otherwise indicated on the approved plans.
- Dataset
- Planning condition
- Reference
- U0110724