5,605 results
Dataset:
-
Typology type: Policy
U0127529Max HGVs
There shall be a maximum of 40 HGV 2-way trips per day (20 in, 20 out) only. Records of deliveries must be kept and made available to the local planning authority for inspection with 7 days notice.
- Dataset
- Planning condition
- Reference
- U0127529
-
Typology type: Policy
U0127530Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, received 29.09.2023 Concept Layout Plans & Elevations, 24011-002 Rev A, received 05.08.2024
- Dataset
- Planning condition
- Reference
- U0127530
-
Typology type: Policy
U0127531Tree Protection
Prior to the commencement of the development hereby granted a scheme for the protection of the root protection areas of all trees shown for retention on the approved plan that complies with clause 6.2 of British Standard 5837: 2012 Trees in Relation to Design, Demolition and Construction - Recommendations shall be submitted to and approved in writing by the Local Planning Authority. Tree protection shall be implemented on site in accordance with the approved details and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0127531
-
Typology type: Policy
U0127532No Dig Driveway
Prior to the commencement of the development hereby granted a scheme detailing the use of no dig construction systems for the installation of the driveway shall be submitted to and approved by the Local Planning Authority. The driveway shall be constructed in accordance with the approved details prior to first occupation of the dwelling hereby approved.
- Dataset
- Planning condition
- Reference
- U0127532
-
Typology type: Policy
U0127533Soft landscaping
No development shall take place on the site until a detailed soft landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a soft landscape plan, a schedule providing plant and tree numbers and details of the species, nursery stock specification in accordance with British Standard 3936-1:1992 Nursery Stock and planting distances of trees and shrubs, and British Standard 8545:2014 Trees: from nursery to independence in the landscape; a specification of planting and staking/guying; a timescale of implementation and details of aftercare for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of the planting. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0127533
-
Typology type: Policy
U0127534Ecological Enhancement
Following the commencement of development activities an ecological enhancement plan based exactly on the measures detailed in Section 5 of the Ecological Impact Assessment (Whitcher Wildlife Ref: 240736. Date: 25th July 2024) shall be implemented prior to the first occupation of the development.
- Dataset
- Planning condition
- Reference
- U0127534
-
Typology type: Policy
U0127535Obscure glazing
Before the first occupation of the dwelling hereby permitted, the window to serve the first floor E/S to Bed 1 as indicated on the approved plans shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0127535
-
Typology type: Policy
U0127715Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed site plan, DNEF 012 JAN/24, received 01.02.2024 Lake Cross Section, DNEF 011 MAR/23, received 20.10.2023
- Dataset
- Planning condition
- Reference
- U0127715
-
Typology type: Policy
U012771630 year bng management plan on-site
On the commencement of development, a Management and Monitoring Plan for proposed onsite habitats based on the proposals set out in the biodiversity net gain report ( CGC Ecology August 2023) shall be submitted to the Local Planning Authority for approval in writing. The Management and Monitoring plan shall detail the following: o The project's biodiversity unit targets. o A detailed adaptive management plan setting out how habitats will be created or enhanced and describing the proposed ongoing management for a minimum of 30 years. o The details of when target condition will be achieved and how it shall be maintained. o A detailed monitoring plan that will be used to inform any potential changes to the ongoing management and assess the progress towards achieving target condition. This should outline the surveys that will be used to inform condition monitoring reports. Monitoring reports will be provided to the Local Planning Authority by the end of years 1,2,5,10,20, and 30 of the monitoring periods. o The roles, responsibilities and professional competencies of the people involved in implementing and monitoring the biodiversity net gain delivery and the management organisation implementing the plan o Evidence that the necessary resources are available to deliver the proposed biodiversity net gain plan and the ongoing management. Once approved in writing the management measures and monitoring plans shall be carried out as agreed.
- Dataset
- Planning condition
- Reference
- U0127716
-
Typology type: Policy
U0127717Drainage
There shall be no piped discharge of surface water from the development. Surface water shall be disposed of via infiltration with excess water draining to the lake after passing through sedimentation removal chambers or reed beds.
- Dataset
- Planning condition
- Reference
- U0127717