U0127519Drainage - Implemented
No part of the development hereby permitted shall be operational until surface water drainage works have been implemented in accordance with the approved details. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.
- Dataset
- Planning condition
- Reference
- U0127519
-
Typology type: Policy
U0127520Drainage - Maintenance
Prior to the first use of the development hereby approved, an updated drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include the following: Details of the private management company responsible for implementing the plan at all times or any successor; Findings of a watercourse CCTV survey to the Norwood and Sandall Hooking Drain terminating at the outflow point at Thorpe Marsh Drain to establish condition and a blockage assessment to be undertaken; Details of any foul drainage, such as compostable toilet, present on the site. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.
- Dataset
- Planning condition
- Reference
- U0127520
-
Typology type: Policy
U0127521Design - External illumination
Details of any external illumination connected to the operational use of the site, including details of luminance and fields of illumination, shall be submitted to, and approved in writing by, the local planning authority, prior to the first export or storage of electricity and there shall be no external illumination other than that so approved. The development shall be carried out in accordance with the agreed details.
- Dataset
- Planning condition
- Reference
- U0127521
-
Typology type: Policy
U0127522Design - Equipment finishes
Prior to the construction or installation of the respective structures identified below, the following details shall first be submitted to, and agreed in writing by, the Local planning Authority: Details of the colour and finish of the GIS hall building. Details of the colour and finish of the energy storage containers. Details of the colour and finish of the water containers. Details of the colour and finish of the DNO substation building. Details of the colour and finish of the perimeter fence. Details including design, height, colour and finish of site access gate. The development shall then be constructed in accordance with the approved details and shall be retained and maintained as such at all times.
- Dataset
- Planning condition
- Reference
- U0127522
-
Typology type: Policy
U0127523Highways - Hard surfacing
Prior to the first use of the site, details of the internal vehicular access points, parking and turning areas for the site and how it is surfaced, drained and where necessary marked out shall be approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details and shall remain available for access for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0127523
-
Typology type: Policy
U0127524Contamination - Imported soils
Any soil or soil forming materials brought to site for soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.
- Dataset
- Planning condition
- Reference
- U0127524
-
Typology type: Policy
U0127525Noise - Bund
Prior to the first use of any part of the energy storage hereby approved, the bund as shown on the approved drawings and outlined within the recommendations of the Noise Survey produced by Inacoustic shall be installed and retained for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0127525
-
Typology type: Policy
U0127526Cabling underground
All cabling (with the exception of that connecting between solar arrays) shall be installed underground.
- Dataset
- Planning condition
- Reference
- U0127526
-
Typology type: Policy
U0127527Works to Trees - AIA
Any works to trees shall be carried out in full accordance with the Arboricultural Impact Assess and Tree Works Plans submitted by RPS. Any tree surgery work necessary to ensure the health and viability of those trees on the site, which has been agreed with the Local Planning Authority shall be retained, shall be carried out in accordance with best arboricultural practice and in compliance with BS5837:2012.
- Dataset
- Planning condition
- Reference
- U0127527
-
Typology type: Policy
U0127528Hours
Operational hours of any demolition and construction activity, including vehicle movements to and from the site are restricted to 0800 to 1800, Monday to Friday and 0800 to 1300 Saturday, and at no time on Sundays or Bank and Public Holidays.
- Dataset
- Planning condition
- Reference
- U0127528