Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0127519

    Drainage - Implemented

    No part of the development hereby permitted shall be operational until surface water drainage works have been implemented in accordance with the approved details. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.

    Reference
    U0127519
  • Typology type: Policy

    U0127520

    Drainage - Maintenance

    Prior to the first use of the development hereby approved, an updated drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include the following: Details of the private management company responsible for implementing the plan at all times or any successor; Findings of a watercourse CCTV survey to the Norwood and Sandall Hooking Drain terminating at the outflow point at Thorpe Marsh Drain to establish condition and a blockage assessment to be undertaken; Details of any foul drainage, such as compostable toilet, present on the site. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.

    Reference
    U0127520
  • Typology type: Policy

    U0127521

    Design - External illumination

    Details of any external illumination connected to the operational use of the site, including details of luminance and fields of illumination, shall be submitted to, and approved in writing by, the local planning authority, prior to the first export or storage of electricity and there shall be no external illumination other than that so approved. The development shall be carried out in accordance with the agreed details.

    Reference
    U0127521
  • Typology type: Policy

    U0127522

    Design - Equipment finishes

    Prior to the construction or installation of the respective structures identified below, the following details shall first be submitted to, and agreed in writing by, the Local planning Authority: Details of the colour and finish of the GIS hall building. Details of the colour and finish of the energy storage containers. Details of the colour and finish of the water containers. Details of the colour and finish of the DNO substation building. Details of the colour and finish of the perimeter fence. Details including design, height, colour and finish of site access gate. The development shall then be constructed in accordance with the approved details and shall be retained and maintained as such at all times.

    Reference
    U0127522
  • Typology type: Policy

    U0127523

    Highways - Hard surfacing

    Prior to the first use of the site, details of the internal vehicular access points, parking and turning areas for the site and how it is surfaced, drained and where necessary marked out shall be approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details and shall remain available for access for the lifetime of the development.

    Reference
    U0127523
  • Typology type: Policy

    U0127524

    Contamination - Imported soils

    Any soil or soil forming materials brought to site for soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    U0127524
  • Typology type: Policy

    U0127525

    Noise - Bund

    Prior to the first use of any part of the energy storage hereby approved, the bund as shown on the approved drawings and outlined within the recommendations of the Noise Survey produced by Inacoustic shall be installed and retained for the lifetime of the development.

    Reference
    U0127525
  • Typology type: Policy

    U0127526

    Cabling underground

    All cabling (with the exception of that connecting between solar arrays) shall be installed underground.

    Reference
    U0127526
  • Typology type: Policy

    U0127527

    Works to Trees - AIA

    Any works to trees shall be carried out in full accordance with the Arboricultural Impact Assess and Tree Works Plans submitted by RPS. Any tree surgery work necessary to ensure the health and viability of those trees on the site, which has been agreed with the Local Planning Authority shall be retained, shall be carried out in accordance with best arboricultural practice and in compliance with BS5837:2012.

    Reference
    U0127527
  • Typology type: Policy

    U0127528

    Hours

    Operational hours of any demolition and construction activity, including vehicle movements to and from the site are restricted to 0800 to 1800, Monday to Friday and 0800 to 1300 Saturday, and at no time on Sundays or Bank and Public Holidays.

    Reference
    U0127528