Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0127509

    Highways - Precom - CMS

    No development shall take place until a Construction Method Statement (CMS) has been submitted to and approved in writing by the Local Planning Authority. The CMS should be written in general accordance with the principles set out in the CTMP submitted 29/11/2023 (reference JNY11726-03a). The approved statement shall include the following: (a) the timetable of the works; (b) daily hours of construction; (c) any road closure or temporary traffic management on Fordstead Lane; (d) hours during which delivery and construction traffic will travel to and from the site, with such vehicular movements being restricted to between 8:00am and 6pm Mondays to Fridays inc.; 8.00am to 1.00pm Saturdays, and no such vehicular movements taking place on Sundays and Bank/Public Holidays unless agreed by the planning Authority in advance; (e) the number and sizes of vehicles visiting the site in connection with the development and the frequency of their visits, including any abnormal loads at least 1 week in advance; (f) the compound/location where all building materials, finished or unfinished products, parts, crates, packing materials and waste will be stored during the demolition and construction phases; (g) areas on-site where delivery vehicles and construction traffic will load or unload building materials, finished or unfinished products, parts, crates, packing materials and waste with confirmation that no construction traffic or delivery vehicles will park on the highway for loading or unloading purposes, unless prior written agreement has been given by the Local Planning Authority; (h) hours during which no construction traffic will be present at the site; (i) the means of enclosure of the site during construction works; (j) details of proposals to promote car sharing amongst construction staff in order to limit construction staff arriving from the west; (k) details of wheel washing facilities and obligations; (l) The proposed route of all construction traffic exceeding 7.5 tonnes; (m) Details of the amount and location of construction worker parking; (n) Photographic evidence of the condition of adjacent public highway prior to commencement of any work; (o) methods of communicating the CMS to staff, visitors and neighbouring residents and businesses; (p) Commitment to providing a responsible person to join a construction traffic liaison committee. The approved CMS shall be adhered to throughout the demolition/construction period.

    Reference
    U0127509
  • Typology type: Policy

    U0127510

    Ecology - Precom - CEMP

    Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include all recommendations set out in the submitted Preliminary Ecological Appraisal (PEA) and Ecological Impact Assessment (EcIA). The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Training required for personnel dealing with spillages and spill kits available on site. 3. Details of maintenance regime for the installed equipment to check for drips and spills. 4. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA 7. A method statement for the survey and protection of badgers 8. A sensitive lighting scheme to reduce night sky illumination and to protect commuting and foraging bats The development shall then be carried out in accordance with the agreed details.

    Reference
    U0127510
  • Typology type: Policy

    U0127511

    Ecology - Precom - On site BNG

    No development shall take place until an On site Biodiversity Net Gain Plan (BNGP), which accords with the agreed Biodiversity Net Gain calculations of not less than 82.59% habitat units, 132.19% hedgerow units and 16.90% watercourse units for proposed onsite habitats has been submitted to and approved in writing by the Local Planning Authority. The Monitoring Plan shall detail the following: i) The baseline biodiversity assessment against which the biodiversity unit value will be monitored as detailed in the Biodiversity Impact Assessment; ii) The biodiversity unit targets; iii) A detailed adaptive management plan setting out how onsite habitats will be created or enhanced (together with timescales for their creation or enhancement) and setting out the proposed ongoing management for a minimum of 30 years; iv) The details of when the target condition will be achieved and how it shall be maintained; v) A detailed monitoring plan that will be used to inform any potential changes to the ongoing management and assess the progress towards achieving the target condition. This shall outline the surveys that will be used to inform condition monitoring reports. Monitoring reports will be provided to the Local Planning Authority before the end of years 1,2,5,10,15, 20, 25 and 30 of the monitoring period; vi) The roles, responsibilities and professional competencies of the people involved in implementing and monitoring the biodiversity net gain delivery; and vii) Details of how the ecological enhancement opportunities identified in the Ecological Impact Assessment shall be secured on the site. The approved BNGP shall thereafter be implemented in full accordance with its terms. Should the expected biodiversity net gains not be achieved then a revised set of habitat retention, enhancement and creation measures shall be submitted to and approved in writing by the local planning authority. The amended measures shall be implemented and retained in accordance with the approved details.

    Reference
    U0127511
  • Typology type: Policy

    U0127512

    Landscaping - Precom - Final details

    Notwithstanding the approved Site Layout and Landscape Method Statement, no development shall take place (including demolition, ground works or vegetation clearance) until a detailed scheme for landscaping the site has been provided to and approved in writing by the local planning authority which shall include:- a) further details of the proposed tree and shrub planting including their species, number, sizes and positions, together with grass seeded/turfed areas and written specifications (including cultivation and other operations associated with plant and grass establishment i.e. depth of topsoil, mulch etc). All species used in the planting proposals associated with the development shall be native species of UK provenance; b) further details of the existing trees and hedgerows to be retained or felled, including existing and proposed soil levels at the base of each tree/hedgerow and the minimum distance between the base of the tree and the nearest edge of any excavation; and c) details of the hard landscaping including access tracks within the development. d) details of overall site management and maintenance responsibilities Following the commencement of the scheme and before 30th September of year 1, 5 and 10, a Landscape Management Plan shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the hard and soft landscaping scheme has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next time period. It shall cover: species, size, location, planting and aftercare specification, and include an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, and before and after photos of any remedial plantings or completed works. Any trees or plants which, within a 5 year period from the date of planting die area removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species. The approved scheme shall be implemented in accordance with the agreed details by the end of the first planting season following commencement of the development and thereafter maintained and managed in accordance with the approved details.

    Reference
    U0127512
  • Typology type: Policy

    U0127513

    Trees - Precom - Tree Protection

    No site clearance, preparatory work or development shall take place in any phase until a scheme for the protection of the retained trees and hedgerows in that phase (the tree and hedgerow protection plan) and the appropriate working methods (the arboricultural method statement) in accordance with paragraphs 5.5 and 6.1 of British Standard BS 5837: Trees in relation to design, demolition and construction - Recommendations (or in an equivalent British Standard if replaced) shall have been submitted to and approved in writing by the Local Planning Authority. The scheme for the protection of the retained trees and hedgerows in the phase shall be carried out as approved ffor that phase and retained throughout the construction period for that phase. Tree protection shall be implemented on site in accordance with the approved details and the Local Planning Authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the Local Planning Authority.

    Reference
    U0127513
  • Typology type: Policy

    U0127514

    Highways - Precom - Site Access

    No development shall take place, including any site clearance or works of demolition, until details of the proposed vehicular access connecting the site with Fordstead Lane have been submitted to and approved in writing. All obstructions exceeding 0.6 metres high shall be cleared from the land within the required visibility splays and shall be kept free of obstacles exceeding 0.6 metres in height for the lifetime of the development. The scheme shall include provision of a metalled haul/access road from Fordstead Lane including a hard-bound material for at least the first 20m from the back edge of the highway carriageway. No part of the development shall be brought into use until all parts of the access have been completed in accordance with the approved plans. The development shall be carried out in accordance with the approved scheme and thereafter retained for the duration of the development.

    Reference
    U0127514
  • Typology type: Policy

    U0127515

    ARCH - Precom - WSI

    Part A No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: o The programme and method of site investigation and recording. o The requirement to seek preservation in situ of identified features of importance. o The programme for post-investigation assessment. o The provision to be made for analysis and reporting. o The provision to be made for publication and dissemination of the results. o The provision to be made for deposition of the archive created. o Nomination of a competent person/persons or organisation to undertake the works. o The timetable for completion of all site investigation and post-investigation works. Part B Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.

    Reference
    U0127515
  • Typology type: Policy

    U0127516

    Battery Safety Management Plan (BSMP)

    Prior to first use of any part of the development hereby approved, a Battery Safety Management Plan (BSMP) shall be submitted to, and approved in writing by, the local planning authority. The BSMP must prescribe measures to facilitate safety during the construction, operation and decommissioning of the battery storage system, including potential risks from battery fire, theft and flooding. The BSMP shall be informed by a detailed Site-Specific Risk Information (SSRI) or other such assessment in consultation with the South Yorkshire Fire and Rescue Service and South Yorkshire Police. The SSRI shall include: Site layout including all access points; Any building overview including size, construction details, operations/use, any internal hazards (i.e compressed gas), service isolation points and contact numbers Identify presence of any automatic firefighting equipment (i.e. fire suppression) External hazards including distances to nearby hazards, hydrant locations and emergency access points Identification of any hazardous substances CCTV Camera Locations The BSMP shall be implemented in accordance with the agreed details at all times.

    Reference
    U0127516
  • Typology type: Policy

    U0127517

    FRA

    The development shall be carried out in accordance with the submitted flood risk assessment by RPS Group referenced HLEF83573 (version 5) dated 21 November 2023, and the following mitigation measures it details: There shall be no land raising as part of the proposals Flood waters will be allowed to flow through the solar farm and across the site Flood resilience construction materials These mitigation measures shall be fully implemented prior to the first export or storage of energy and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0127517
  • Typology type: Policy

    U0127518

    Drainage - Outfall Design

    No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.

    Reference
    U0127518