Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0127074Render (FUL/LBC)
Repairs to render following the addition and amendment to existing openings shall match existing unless otherwise agreed in writing by the Local Planning Authority. If part or all of the existing render is to be replaced and is not to match existing than a 1m x 1m sample panel, showing colour, finish and texture, shall be prepared on site for the inspection of and approved in writing by the Local Planning Authority. Development to be carried out in accordance with approved details.
- Dataset
- Planning condition
- Reference
- U0127074
-
Typology type: Policy
U0127075Glazed link (FUL/LBC)
Notwithstanding details submitted as part of the approved scheme prior to commencement of relevant works full details of the glazed links which project into the external courtyards shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0127075
-
Typology type: Policy
U0127076Stonework (FUL/LBC)
Prior to commencement of relevant works a 1m x 1m sample panel of stonework to be used as the base to the glazed links and on dwarf walls enclosing the external courtyards, showing stone, coursing and pointing shall be prepared on site for the inspection of and approved in writing by the Local Planning Authority. Stonework to be limestone random rubble brought to course. Development to be carried out in accordance with approved details.
- Dataset
- Planning condition
- Reference
- U0127076
-
Typology type: Policy
U0127077Slate (FUL/LBC)
Replacement of any slates following the removal of existing and replacement rooflights shall match existing unless otherwise agreed in writing by the Local Planning Authority. A sample of any addition slate shall be provided on site for the inspection of and approved in writing by the Local Planning Authority. Development to be carried out in accordance with approved details.
- Dataset
- Planning condition
- Reference
- U0127077
-
Typology type: Policy
U0127078Rainwater goods (FUL/LBC)
Prior to commencement of relevant works details of any new and/or replacement rainwater goods shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0127078
-
Typology type: Policy
U0127079Round headed openings (LBC)
Prior to commencement of relevant works an updated schedule for works to the former mangers/round headed openings/recesses shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0127079
-
Typology type: Policy
U0127505STAT1 - 5 Years
The development to which this permission relates must be begun not later than the expiration of five years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0127505
-
Typology type: Policy
U0127506Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Landscape Proposals Rev E (drg no. ST19481-020) received 07/08/2024 Layout Plan V9 received 27/03/2024 IDB Offset V2 received 27/02/2024 MV Skid/Inverter Dimensions (drg no. 14) received 29/11/2023 Energy Storage Dimensions (drg no. 15) received 29/11/2023 Access Tracks - Energy Storage System (drg no.16) received 29/11/2023 Access Track (Solar) (drg no. 17) received 29/11/2023 CCTV Post (drg no. 20) received 29/11/2023 Water Container (drg no. 21) received 29/11/2023 Substation Layout (drg no. 25) received 29/11/2023 Substation Elevations A & B (drg no. 26) received 29/11/2023 Substation Elevations C & D (drg no. 27) received 29/11/2023 132kV Substation Layout (drg no. 28) received 29/11/2023 Car Parking Details (drg no. 29) received 29/11/2023 Planning Application Boundary V2 received 29/11/2023 PV Panel Details (drg no. 4) received 29/11/2023 Flow Exceedance Plan V1 (drg no. HLEF83573-RPS-FRA-ThorpeFE-DR-1-230912) received 29/11/2023 Conceptual Drainage Plan V1 (drg no. HLEF83573-RPS-FRA-Thorpe-DR-1-230911) received 29/11/2023 Palisade Fence V2 (drg no. 2) received 29/11/2023 Onsite Power Conversion Station (drg no. 6) received 29/11/2023 Security Gate Details (drg no. 7) received 29/11/2023 Spares Container (drg no. 8) received 29/11/2023
- Dataset
- Planning condition
- Reference
- U0127506
-
Typology type: Policy
U0127507Commencement, Time Limit - 50 Years
The planning permission hereby granted shall be limited to a period of 50 years commencing from the date electricity is first stored or distributed to the National Grid. The local planning authority shall be notified in writing of the date of first electricity storage by or distribution from the development within 10 working days of the event date. At the end of this 50-year period, or in the event the battery energy storage system and ancillary development is no longer required for power storage and distribution in connection with Thorpe Marsh substation or becomes redundant, whichever occurs first, the development shall be permanently removed from the site and the land restored to its previous agricultural use in accordance with a scheme of works containing the details set out in Condition *, that shall have previously been submitted to and approved in writing by the local planning authority under the terms also set out in Condition *.
- Dataset
- Planning condition
- Reference
- U0127507
-
Typology type: Policy
U0127508Scheme of Reinstatement - within 6 month
No later than 6 months prior to the expiry of the planning permission, or within 6 months of the cessation of electricity generation or storage and distribution by this facility, whichever is the sooner, a detailed scheme of works for the removal of the development shall be submitted to and approved in writing by the local planning authority. The scheme of works shall include the following details: i) a programme of works; ii) a method statement for the decommissioning and dismantling of all equipment and surfacing on site; iii) details of any items to be retained on site; iv) a method statement for restoring the land to agriculture; v) timescale for the decommissioning, removal and reinstatement of the land; vi) a method statement for the disposal/recycling of redundant equipment/structures. The scheme of works shall be undertaken in accordance with the approved details and timescales. The local planning authority shall be notified in writing of the date of the cessation of electricity storage by or distribution from the development within 10 working days of the event date.
- Dataset
- Planning condition
- Reference
- U0127508