Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0125525

    Obscure Glazing

    The first-floor windows on the side elevations of the dwellings shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter.

    Reference
    U0125525
  • Typology type: Policy

    U0125526

    Contamination (CON1)

    No development shall commence until a contaminated land assessment and associated remedial strategy, together with a timetable of works, has been submitted to and approved in writing by the Local Planning Authority (LPA). a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.

    Reference
    U0125526
  • Typology type: Policy

    U0125527

    Contamination (CON2)

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been submitted to and approved in writing by the LPA.

    Reference
    U0125527
  • Typology type: Policy

    U0125528

    Contamination (CON3)

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by an appropriate risk assessment) and source material information shall be submitted to and approved in writing by the Local Planning Authority prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    U0125528
  • Typology type: Policy

    U0125529

    Liquid Storage Tanks

    Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks.

    Reference
    U0125529
  • Typology type: Policy

    U0125530

    Yorkshire Water CEMP

    No development shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, in order to understand the impact of the planning permission on the principal aquifer. The development shall thereafter be carried out in accordance with the recommendations of the approved CEMP.

    Reference
    U0125530
  • Typology type: Policy

    U0125531

    Tree Protection Measures

    The development hereby granted shall not be commenced nor materials or machinery brought onto the site until the trees which it has been agreed shall be retained are fenced off in accordance with a scheme that has been submitted to and approved in writing by the Local Planning Authority. The works shall thereafter be carried out in accordance with the approved scheme.

    Reference
    U0125531
  • Typology type: Policy

    U0125532

    Soft Landscaping

    Prior to the commencement of above ground works, details of a landscaping/planting scheme shall be submitted to and agreed in writing by the Local Planning Authority. This scheme shall indicate all existing trees and hedgerows on the site, showing their respective size, species and condition. It shall distinguish between those which are to be retained, those proposed for removal and those requiring surgery. The scheme should also indicate, where appropriate, full details of new or replacement planting. Planting shall take place in the first suitable planting season, following the commencement of the development. Any tree or shrub planted in accordance with the scheme and becoming damaged, diseased, dying or removed within five years of planting shall be replaced in accordance with the above document.

    Reference
    U0125532
  • Typology type: Policy

    U0125533

    Ecological Enhancement Measures

    Prior to the occupation of the dwellings, the ecological measures outlined within Site Plan Ecology (SM-004 Rev E) shall be implemented in full.

    Reference
    U0125533
  • Typology type: Policy

    U0125534

    Access and Parking Area

    Prior to the occupation of the dwelling, details of the surfacing of the part of the site which shall be used by vehicles shall be submitted to and approved in writing by te Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details and the driveway and parking area shall be provided prior to the occupation of the dwellings.

    Reference
    U0125534