Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0125302No piped discharge
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered and why they have been discounted; and ii) the means of discharging to the public sewer network at a rate to not exceed 3.5 litres per second.
- Dataset
- Planning condition
- Reference
- U0125302
-
Typology type: Policy
U0125303SUDS
The Developer should be aware that a Sustainable Drainage System (SuDS) is the LPA's preferred option. A detailed explanation of any alternative option and reasons for rejecting a SuDS solution will be required.
- Dataset
- Planning condition
- Reference
- U0125303
-
Typology type: Policy
U0125304Sustainable drainage
No building hereby permitted shall be occupied until the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be designed, managed and maintained in accordance with the Non-statutory technical standards and local standards
- Dataset
- Planning condition
- Reference
- U0125304
-
Typology type: Policy
U0125305landscape
The landscape scheme shown on Drawing 'Landscape Proposals' 2487_03 hereby approved, shall be implemented in the first available planting season after commencement of development. The local Planning Authority shall be notified in writing within 7 working days of completion of the landscape works to the required standard and the completion shall be subsequently approved in writing by the Local Planning Authority. The approved scheme shall be maintained for a minimum of five years. Any landscape feature which is defective, damaged or removed within five years of establishment shall be replaced.
- Dataset
- Planning condition
- Reference
- U0125305
-
Typology type: Policy
U0125348Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0125348
-
Typology type: Policy
U0125349Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (023/083/LP) - Proposed Plans (023/083/SP/H) (received 21 June 2024) - Proposed Plans (023/083/PP/J) (received 27 June 2024)
- Dataset
- Planning condition
- Reference
- U0125349
-
Typology type: Policy
U0125350Amenity Space
Prior to the occupation of the proposed flats, a hard and soft landscaping scheme for the proposed amenity space, as shown on 'Proposed Plans' (023/083/SP/H) (received 21 June 2024), shall be submitted to and approved in writing by the local planning authority. The amenity space shall thereafter be provided in accordance with the approved details prior to the occupation of the proposed flats.
- Dataset
- Planning condition
- Reference
- U0125350
-
Typology type: Policy
U0125351Obscure Glazing
The window on the side elevation for apartment 2 as shown on 'Proposed Plans' (023/083/PP/J) (received 27 June 2024) shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures, and shall be permanently retained in that condition thereafter.
- Dataset
- Planning condition
- Reference
- U0125351
-
Typology type: Policy
U0125352Opening Hours
The hours of opening shall be limited to: - 9.00 am to 6.00pm Mondays to Saturdays; - 11.00am to 4.00pm on Sundays; and - Not at all on bank holidays.
- Dataset
- Planning condition
- Reference
- U0125352
-
Typology type: Policy
U0125353Render
Prior to commencement of above ground works, details including samples of the proposed new render shall be submitted to and approved in writing by the local planning authority (LPA). The sample shall show the colour, texture and finish of the render. Development shall thereafter be carried out in accordance with agreed details.
- Dataset
- Planning condition
- Reference
- U0125353