Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0124941Removed
Removed.
- Dataset
- Planning condition
- Reference
- U0124941
-
Typology type: Policy
U0124942CMS
The development hereby permitted must be carried out and completed entirely in accordance with the Construction Method Statement and the details shown on the approved plans and specifications.
- Dataset
- Planning condition
- Reference
- U0124942
-
Typology type: Policy
U0124943Drainage
A surface water sustainable system (SuDS) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the building into use.
- Dataset
- Planning condition
- Reference
- U0124943
-
Typology type: Policy
U0124944Materials - temple
Prior to the commencement of the relevant works, details of the proposed external materials for the temple shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0124944
-
Typology type: Policy
U0124945Workshop temporary uses - removed
Removed.
- Dataset
- Planning condition
- Reference
- U0124945
-
Typology type: Policy
U0125097Expiration of three years
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0125097
-
Typology type: Policy
U0125098plans
The development hereby permitted must be carried out and completed in accordance with the terms of this permission and the details shown on the approved plans listed below: 23/121 drg. no. 002C (for the rear property) 23/121 drg. no, 003 (in relation to the frontage property element only) 23/121 drg. no. 004A 23/121 drg. no. 007A
- Dataset
- Planning condition
- Reference
- U0125098
-
Typology type: Policy
U0125099Site to be used by vehicles
Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0125099
-
Typology type: Policy
U0125100Unexpected significant contamination
Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0125100
-
Typology type: Policy
U0125101first floor side windows obscure
Before the first occupation of the dwellings hereby permitted, the first floor side elevation windows of both dwellings hereby appoved shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0125101