Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0124941

    Removed

    Removed.

    Reference
    U0124941
  • Typology type: Policy

    U0124942

    CMS

    The development hereby permitted must be carried out and completed entirely in accordance with the Construction Method Statement and the details shown on the approved plans and specifications.

    Reference
    U0124942
  • Typology type: Policy

    U0124943

    Drainage

    A surface water sustainable system (SuDS) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the building into use.

    Reference
    U0124943
  • Typology type: Policy

    U0124944

    Materials - temple

    Prior to the commencement of the relevant works, details of the proposed external materials for the temple shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0124944
  • Typology type: Policy

    U0124945

    Workshop temporary uses - removed

    Removed.

    Reference
    U0124945
  • Typology type: Policy

    U0125097

    Expiration of three years

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0125097
  • Typology type: Policy

    U0125098

    plans

    The development hereby permitted must be carried out and completed in accordance with the terms of this permission and the details shown on the approved plans listed below: 23/121 drg. no. 002C (for the rear property) 23/121 drg. no, 003 (in relation to the frontage property element only) 23/121 drg. no. 004A 23/121 drg. no. 007A

    Reference
    U0125098
  • Typology type: Policy

    U0125099

    Site to be used by vehicles

    Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the local planning authority.

    Reference
    U0125099
  • Typology type: Policy

    U0125100

    Unexpected significant contamination

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.

    Reference
    U0125100
  • Typology type: Policy

    U0125101

    first floor side windows obscure

    Before the first occupation of the dwellings hereby permitted, the first floor side elevation windows of both dwellings hereby appoved shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority.

    Reference
    U0125101