Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0123842

    'No-notice' site visits

    From the commencement of the development, 'FERA' or any other company approved in writing by the Mineral Planning Authority shall carry out 'no-notice' site visits to the site in accordance with para. 2.1.4 of the Bird Management Plan (Ref: W6AV1000 - dated 9th December 2011). The frequency of the visits shall be initially every quarter for the first year of operations and following the visits, a report shall be prepared and submitted to the Mineral Planning Authority within 1 month of the visit being undertaken. For the remaining years of the quarry operation the frequency of 'no-notice' visits shall be determined by the Mineral Planning Authority.

    Reference
    U0123842
  • Typology type: Policy

    U0123843

    Buildings one storey high

    Unless otherwise approved in writing by the Mineral Planning Authority the buildings shall be one storey high, not exceeding 2.5m in height. The colour shall be 'off-white'. The buildings shall be fitted with 'bird defender spikes' prior to installation on site and shall be maintained with such for the life of the development.

    Reference
    U0123843
  • Typology type: Policy

    U0123844

    Equipment removed within 6mths

    On the cessation of workings all buildings, plant, surface equipment, hard standing areas and internal haul roads shall be removed from the site within 6 months of the date of such cessation, unless otherwise approved in writing by the Mineral Planning Authority.

    Reference
    U0123844
  • Typology type: Policy

    U0123845

    Copy of the planning permission

    From the commencement of development to its completion a copy of the planning permission, including all plans and documents hereby approved and any plans and documents subsequently approved in accordance with this permission, shall be kept on site at all times.

    Reference
    U0123845
  • Typology type: Policy

    U0123846

    No fixed plant or buildings

    Notwithstanding the provisions of Schedule 2 of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting that order with or without modification), no fixed plant or buildings other than those hereby permitted shall be erected or stored on the site without the prior written approval of the Mineral Planning Authority.

    Reference
    U0123846
  • Typology type: Policy

    U0123847

    Annual minerals monitoring data

    The applicant must provide annual minerals monitoring data, to include sand and gravel sales and the remaining site reserve (in tonnes) for each year of extraction. The information must be reported to the Mineral Planning Authority between January and March for each year of extraction and provide the information for the previous year's extraction. The applicant will also be required to inform the authority when extraction has ceased on site.

    Reference
    U0123847
  • Typology type: Policy

    U0123848

    Maximum height of any plant or machinery

    Unless otherwise approved in writing by the Mineral Planning Authority the maximum height of any plant or machinery shall not exceed 4 metres above ground level.

    Reference
    U0123848
  • Typology type: Policy

    U0123948

    Approved Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing & Proposed Site Layout (DRB2 received 13 June 2024) - Proposed Elevations and Layouts Plot 1 (DRB 3) - Proposed Elevations and Layouts Plot 2 (DRB 4) - Plot 1 Garage (DRB 3A) - Plot 2 Garage (DRB 4A) - Street Scene Plan (DRB5 received 13 June 2024)

    Reference
    U0123948
  • Typology type: Policy

    U0123949

    Ecological Enhancement Measures

    The approved enhancement measures set out within the Ecological Enhancement Plans (November 2023) (prepared by ELM Ecology) shall be implemented in full accordance with the approved details prior to the occupation of the dwellings. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme.

    Reference
    U0123949
  • Typology type: Policy

    U0123950

    External Materials

    Prior to the commencement of above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0123950