Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0123832

    Alternative restoration scheme

    Should operations permanently cease at any time before the full term of this permission, an alternative restoration scheme shall be submitted to and approved in writing by the Mineral Planning Authority and implemented within 6 months of receiving such approval.

    Reference
    U0123832
  • Typology type: Policy

    U0123833

    No areas of open water created

    No areas of open water shall be created as part of the mineral extraction operations, including the reclamation of the site, unless otherwise approved in writing by the Mineral Planning Authority.

    Reference
    U0123833
  • Typology type: Policy

    U0123834

    Working hours

    Unless otherwise approved in writing by the Mineral Planning Authority working hours shall be restricted to 07:00 - 19:00 hrs Mondays to Fridays; 07:30 - 12:00 hrs Saturdays with no working at all on Sundays, Public Holidays or Bank Holidays.

    Reference
    U0123834
  • Typology type: Policy

    U0123835

    Noise limits

    Noise limits at the following properties are set as follows: - Woodside Nurseries 55 dBLAeq, 1hr; - Foxhill Farm 52 dBLAeq, 1hr - Partridge Hill Farm 52 dBLAeq, 1hr.

    Reference
    U0123835
  • Typology type: Policy

    U0123836

    Exceptionally noisy operations

    Unless otherwise approved in writing by the Mineral Planning Authority, exceptionally noisy operations (as defined in the NPPF) such as soil stripping and replacement and baffle mound formation and removal shall be restricted to a maximum of eight weeks in any one year and shall be carried out only between the hours of: 0830 - 1730 hrs Mondays to Fridays 0930 - 1300 hrs Saturdays and at no time on Sundays or Bank Holidays or Public Holidays. Prior to such exceptionally noisy operations taking place the Mineral Planning Authority shall be notified in writing at least 2 days prior to such operations taking place.

    Reference
    U0123836
  • Typology type: Policy

    U0123837

    Vehicles fitted with reversing alarms

    All vehicles operating at the quarry shall be fitted with broad band reversing alarms, or other reversing alarms as approved in writing by the Mineral Planning Authority.

    Reference
    U0123837
  • Typology type: Policy

    U0123838

    Silencers fitted and maintained

    Silencers shall be fitted to, used and maintained, in accordance with manufacturer's instructions, on all vehicles, plant and machinery used on the site. Equipment that develops any fault resulting in a noisy operation shall be immediately removed from use until the fault is remedied.

    Reference
    U0123838
  • Typology type: Policy

    U0123839

    Topsoil and subsoil storage mounds

    All topsoil and subsoil storage mounds and any overburden mounds, which are to remain undisturbed for a period of 6 months, shall be seeded with a grass mix as soon as is practicable to prevent surface wind entrainment.

    Reference
    U0123839
  • Typology type: Policy

    U0123840

    No stockpiles over 4m

    No mineral or soil stockpiles shall be formed to a height higher than 4 metres above the proposed ground levels unless otherwise approved in writing by the Mineral Planning Authority.

    Reference
    U0123840
  • Typology type: Policy

    U0123841

    Bird Management Plan/Restoration Guidanc

    During the life of the development the site shall be operated in strict accordance with the 'Bird Management Plan and Restoration Guidance' (Ref: W6AV1000, dated 9 December 2011) unless the requirements of Condition no12 recommends amendments to this document, which shall be incorporated into a revised document.

    Reference
    U0123841