Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0122823Management and Monitoring Plan
The development herevby approved shall be carried out in accordance with the submitted report BM3 Landscape and Habitat Management & Maintenance Plan Watch House Lane, Doncaster Places for People Homes Limited, 71902 dated April 2024
- Dataset
- Planning condition
- Reference
- U0122823
-
Typology type: Policy
U0122824Separate systems of drainage
The site shall be developed with separate systems of drainage for foul and surface water on and off the site. Surface water from the entire site shall be restricted to a maximum rate of 3.5 litres per second, to the public surface water sewer network.
- Dataset
- Planning condition
- Reference
- U0122824
-
Typology type: Policy
U0122825Protection of public sewer
No building or other obstruction including landscape features shall be located over or within 3.5 metres either side of the centre line of the public sewer i.e. a protected strip width of 7 metres that crosses the site. If the required stand-off distance is to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the local planning authority that the diversion or closure has been agreed with the relevant statutory undertaker and that prior to the construction in the affected area, the approved works have been undertaken.
- Dataset
- Planning condition
- Reference
- U0122825
-
Typology type: Policy
U0122826Sustainable drainage scheme
No building hereby permitted shall be occupied until the sustainable drainage scheme for the site has been completed in accordance with the approved details. The sustainable drainage scheme shall be designed, managed and maintained in accordance with the Non-statutory technical standards and local standards.
- Dataset
- Planning condition
- Reference
- U0122826
-
Typology type: Policy
U0122827Landscaping management
No development shall take place on the site until a detailed aftercare/maintenance plan based on the Planting Strategy (Drawing number D900 Rev G dated 30.04.24) with clear scheduling and responsibilities for a minimum of 5 years following practical completion of the landscape works has been submitted and approved in writing with the local planning authority. Thereafter the approved landscape scheme (Drawing number D900 Rev G dated 30.04.24) shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be completed in full accordance with the approved scheme, prior to occupation of the home, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0122827
-
Typology type: Policy
U0122828Wall to be retained
Prior to the occupation of any of the plots between 7 to 23, the existing 3.2m high wall that runs along the rear garden of the houses on Fairfield Road (as indicated on Drawing number D01 rev N dated 29.04.24) shall be made safe and retained in accordance with the details shown on Drawing number D03(1) dated March 2024.
- Dataset
- Planning condition
- Reference
- U0122828
-
Typology type: Policy
U0122842Earthworks
All bund removal earthworks shall be in accordance with the Unity Energy Plot R1 Earthworks Strategy JA/12th December 2023 & Plan UE-BR-REDLINE-PL-02 Rev A, unless otherwise approved in writing with the LPA. The works shall be carried out in full on site under a Material Management Plan to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0122842
-
Typology type: Policy
U0122843BNG
Within 3 months of the date of this permission, an Ecological Enhancement Plan shall be submitted to the Local Planning Authority for approval in writing. This plan shall include details of any measures outlined in Section 4.0 of theBiodiversity Net Gain Strategy (FPCR December 2023) and which shall be implemented as soon as reasonably practical following the removal of the earth,or an alternative timescale to be approved in writing with the Local Planning Authority:
- Dataset
- Planning condition
- Reference
- U0122843
-
Typology type: Policy
U0122844BNG Monitoring
Prior to the completion of development activities a 30 year Adaptive Management and Monitoring Plan for proposed onsite habitats shall be submitted to the Local Planning Authority for approval in writing. The plan shall detail the following: - A 30-year adaptive management plan for the site detailing the management measures to be carried out in order to achieve the target conditions proposed for each habitat parcel. - The format of monitoring reports that shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, 5, 10, 25 and 30) immediately following habitat creation. GIS files showing the current habitat condition of each habitat parcel will accompany each monitoring report. Once approved in writing the management measures and monitoring plans shall be carried out as agreed.
- Dataset
- Planning condition
- Reference
- U0122844
-
Typology type: Policy
U0122845CEMP ecology
Prior to the commencement of development, a Construction Environmental Management Plan shall be submitted to the LPA for approval, and the implemented in accordance with the approved details. o A risk assessment of the potentially damaging construction activities in relation to wildlife and habitats. o A method statement for the protection of reptiles and other terrestrial fauna that may be encountered on site. o The use of protective fencing, exclusion barriers and wildlife safety measures.
- Dataset
- Planning condition
- Reference
- U0122845