Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0122493

    Seperate systems

    The site shall be developed with seperate systems of drainage for foul and surface water on and off site. The seperate systems should extend to the points of discharge to be agreed.

    Reference
    U0122493
  • Typology type: Policy

    U0122494

    No piped discharge

    There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.

    Reference
    U0122494
  • Typology type: Policy

    U0122508

    Approved Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Drawing No 0923-60LR-001 received 22.09.2023 Drawing No 0923-60LR-002 received on 22.09.2023

    Reference
    U0122508
  • Typology type: Policy

    U0122509

    Opening Hours

    The hours of opening shall be limited to: Tuesday to Friday from 9:30 to 15:30 Saturday from 9:30 to 11:30 Closed on Bank Holidays, Sundays and Mondays.

    Reference
    U0122509
  • Typology type: Policy

    U0122510

    Maximum of 1 staff member

    There shall be a maximum of one staff member working at the property.

    Reference
    U0122510
  • Typology type: Policy

    U0122511

    Maximum of 3 customer per day

    There shall be a maximum of three customer per day.

    Reference
    U0122511
  • Typology type: Policy

    U0122512

    Maximum of 1 customer at a time

    There shall be a maximum of one customer at the property at any one time.

    Reference
    U0122512
  • Typology type: Policy

    U0122513

    Appointment Only

    Customers shall arrive at the property on an appointment basis only.

    Reference
    U0122513
  • Typology type: Policy

    U0122522

    approved plans

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans and documents referenced and dated as follows: Proposed Plans (ref 1171) - amended 23/01/2023 Site Plan (ref 1171) - amended 15/03/2023 Drainage Plan dated 18/01/2024 Landscaping Plan - received 03/11/2023 Construction Environmental Management Plan - received 21/09/2023

    Reference
    U0122522
  • Typology type: Policy

    U0122523

    FRA FFL

    The development shall be carried out in accordance with the submitted flood risk assessment (unreferenced, dated 17th November 2023 and complied by Howard J Wroot) and the following mitigation measures it details: There shall be a 9 metre easement provided between the tackle shop/WC/ and the top of bank of the Woodhouse Sewer (which is often referred to as the 'Diggin Dyke' throughout the application). Finished floor levels shall be set no lower than 3.1 metres above Ordnance Datum (AOD) as per section 5.5 of the FRA Flood resilience measures should be incorporated into the development as detailed within Section 5.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0122523