Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0121842Cycle storage
Prior to first occupation of the development hereby approved, details of secure, enclosed cycle storage facilities for the development shall be submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the first occupation of the development hereby permitted and shall thereafter be retained for use at all times in accordance with those approved details.
- Dataset
- Planning condition
- Reference
- U0121842
-
Typology type: Policy
U0121843Waste Management Plan
Prior to first occupation of the flats, the applicant shall submit for approval to the local planning authority, a scheme for the management and storage of waste at the property (residential and commercial), including bin store(s) construction, maintenance of the area and placing of bins for collection and their return. All such requirements of the approved scheme shall be implemented prior to occupation and subsequently complied with.
- Dataset
- Planning condition
- Reference
- U0121843
-
Typology type: Policy
U0121844Air Quality mitigation
The mitigation measures as set out at 6.2 and 6.3 of the approved Air Quality Assessment (Viridian Air ref. VA-2024-508, dated 17th April 2024) shall be implemented in full prior to the first occupation of the development hereby approved: - low NOx gas fired boilers (<56 mg/kWh) - one EV charging point per dwelling, in compliance with Building Regulations or, if they are not applicable, Appendix 4 of the Council's Air Quality Technical Planning Guidance 2022.
- Dataset
- Planning condition
- Reference
- U0121844
-
Typology type: Policy
U0121845Flood risk mitigation measures
The development shall be carried out in accordance with the approved flood risk assessment and site plans and the following mitigation measures they detail: - Finished floor levels shall be set no lower than existing - As per the submitted floor plans (Drawing 001, Sept 2023, 23/161) there shall be no ground floor sleeping acommodation These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0121845
-
Typology type: Policy
U0121846Class E restriction
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) and the Town and Country Planning (Use Classes) Order 1987, or any Order revoking and re-enacting that Order with or without modification), the commercial unit in the development hereby approved shall only be used/occupied by uses falling within Use Class E(a) - Shops other than for the sale of hot food, or Use Class E(c) (iii)- Other appropriate services in a commercial, business or service locality, and for no other purpose (including any other purpose in Class E of the Schedule to the Use Classes Order).
- Dataset
- Planning condition
- Reference
- U0121846
-
Typology type: Policy
U0121851time limit
The development hereby permitted shall be for the lifespan of this modular building only. At the end of this lifespan, the modular building hereby permitted shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0121851
-
Typology type: Policy
U0121852plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site Plan 23-136 SP Rev 1 dated 21.11.23 Design and Access Statement Rev.2 dated 6.11.23 Proposed Plans WRBE1329-Planning dated 23.10.23 CTMP amended and dated 25.4.24 rev B (Doc number: H&S 06/00a, rev 2.0), submitted on the 2.5.24 Drainage details received 8.1.24 Foul and Surface Water Drainage Strategy Plan 18547-500 Rev 7 dated 6.12.23 received 8.1.24 Drainage Details Plan 18547-501 Rev 4 dated 6.12.23 received 8.1.24 Drainage Strategy Report (DSR) 18547-DSR Dec 2023 received 8.1.24 Drainage Report by Jaxx engineering dated 10.11.23 JEC3467/GEO/001 including 3 percolation tests received 26.3.24 Proposed Sparrow Box and location plan for ecology enhancement Rev 1 dated 8.2.24 and received 17.2.24
- Dataset
- Planning condition
- Reference
- U0121852
-
Typology type: Policy
U0121853CTMP
The Construction Traffic Management Plan (amended and dated 25.4.24 rev B (Doc number: H&S 06/00a, rev 2.0), submitted on the 2.5.24), hereby approved, shall be adhered to. Unless otherwise agreed in writing with the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0121853
-
Typology type: Policy
U0121854policy 51
The relocated gym equipment shall be the same or enhanced provision that will be lost to development and shall be within the school grounds. This gym equipment, shall be usable within 3 months of the completion of the modular building.
- Dataset
- Planning condition
- Reference
- U0121854
-
Typology type: Policy
U0121855sparrow box
The ecology enhancement Sparrow Box shall be installed onto the building as shown on the approved details within 1 month of the completion of the modular building.
- Dataset
- Planning condition
- Reference
- U0121855