Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0121842

    Cycle storage

    Prior to first occupation of the development hereby approved, details of secure, enclosed cycle storage facilities for the development shall be submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the first occupation of the development hereby permitted and shall thereafter be retained for use at all times in accordance with those approved details.

    Reference
    U0121842
  • Typology type: Policy

    U0121843

    Waste Management Plan

    Prior to first occupation of the flats, the applicant shall submit for approval to the local planning authority, a scheme for the management and storage of waste at the property (residential and commercial), including bin store(s) construction, maintenance of the area and placing of bins for collection and their return. All such requirements of the approved scheme shall be implemented prior to occupation and subsequently complied with.

    Reference
    U0121843
  • Typology type: Policy

    U0121844

    Air Quality mitigation

    The mitigation measures as set out at 6.2 and 6.3 of the approved Air Quality Assessment (Viridian Air ref. VA-2024-508, dated 17th April 2024) shall be implemented in full prior to the first occupation of the development hereby approved: - low NOx gas fired boilers (<56 mg/kWh) - one EV charging point per dwelling, in compliance with Building Regulations or, if they are not applicable, Appendix 4 of the Council's Air Quality Technical Planning Guidance 2022.

    Reference
    U0121844
  • Typology type: Policy

    U0121845

    Flood risk mitigation measures

    The development shall be carried out in accordance with the approved flood risk assessment and site plans and the following mitigation measures they detail: - Finished floor levels shall be set no lower than existing - As per the submitted floor plans (Drawing 001, Sept 2023, 23/161) there shall be no ground floor sleeping acommodation These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0121845
  • Typology type: Policy

    U0121846

    Class E restriction

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) and the Town and Country Planning (Use Classes) Order 1987, or any Order revoking and re-enacting that Order with or without modification), the commercial unit in the development hereby approved shall only be used/occupied by uses falling within Use Class E(a) - Shops other than for the sale of hot food, or Use Class E(c) (iii)- Other appropriate services in a commercial, business or service locality, and for no other purpose (including any other purpose in Class E of the Schedule to the Use Classes Order).

    Reference
    U0121846
  • Typology type: Policy

    U0121851

    time limit

    The development hereby permitted shall be for the lifespan of this modular building only. At the end of this lifespan, the modular building hereby permitted shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.

    Reference
    U0121851
  • Typology type: Policy

    U0121852

    plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site Plan 23-136 SP Rev 1 dated 21.11.23 Design and Access Statement Rev.2 dated 6.11.23 Proposed Plans WRBE1329-Planning dated 23.10.23 CTMP amended and dated 25.4.24 rev B (Doc number: H&S 06/00a, rev 2.0), submitted on the 2.5.24 Drainage details received 8.1.24 Foul and Surface Water Drainage Strategy Plan 18547-500 Rev 7 dated 6.12.23 received 8.1.24 Drainage Details Plan 18547-501 Rev 4 dated 6.12.23 received 8.1.24 Drainage Strategy Report (DSR) 18547-DSR Dec 2023 received 8.1.24 Drainage Report by Jaxx engineering dated 10.11.23 JEC3467/GEO/001 including 3 percolation tests received 26.3.24 Proposed Sparrow Box and location plan for ecology enhancement Rev 1 dated 8.2.24 and received 17.2.24

    Reference
    U0121852
  • Typology type: Policy

    U0121853

    CTMP

    The Construction Traffic Management Plan (amended and dated 25.4.24 rev B (Doc number: H&S 06/00a, rev 2.0), submitted on the 2.5.24), hereby approved, shall be adhered to. Unless otherwise agreed in writing with the Local Planning Authority.

    Reference
    U0121853
  • Typology type: Policy

    U0121854

    policy 51

    The relocated gym equipment shall be the same or enhanced provision that will be lost to development and shall be within the school grounds. This gym equipment, shall be usable within 3 months of the completion of the modular building.

    Reference
    U0121854
  • Typology type: Policy

    U0121855

    sparrow box

    The ecology enhancement Sparrow Box shall be installed onto the building as shown on the approved details within 1 month of the completion of the modular building.

    Reference
    U0121855