U0121823Time Limit
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0121823
-
Typology type: Policy
U0121824Approved Documents
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: - Site Location Plan as Existing (DWG no001); - Site Plan as Proposed (DWG no004 Rev A); - Housetype A - Plans as Proposed (DWG no002 Rev B); - Housetype B - Plans as Proposed (DWG no003 A); - Ibstock Ivanhoe Westminster Brick 65mm Red Multi; - Marley Mendip Tile Old English Dark Red; - Hydro Brake Optimum SHE-0082-2500-0500-2500 (dated 8 February 2024); - 23668 Harlequin Thorne Surface Water Drainage Maintenance and Management Schedule; - File 23688 Harlequin Flow 10C; - Drainage Strategy (DWG no23688-DR-C-0100 P2); - Supplemental Investigation for Soil Contamination dated 4 December 2023 (ref: 23150/SI/01); - Flood Risk and Sequential Test Assessment (dated 17 July 2023); - Flood Evacuation Plan received on 22 April 2024; - Phase 1 Preliminary Geo Environmental Risk Assessment (Report Ref: 23150/P1/0 dated une 2023); - Preliminary Bat Roost Assessment Report (ref: HQ.7.11.2019 dated 25 November 2019).
- Dataset
- Planning condition
- Reference
- U0121824
-
Typology type: Policy
U0121825Contaminated land assessment
No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0121825
-
Typology type: Policy
U0121826Discharge of Surface Water
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to: i) evidence that other means of surface water drainage have been properly considered and why they have been discounted; and ii) the means of discharging to the public sewer network at a rate to not exceed 2.5 litres per second.
- Dataset
- Planning condition
- Reference
- U0121826
-
Typology type: Policy
U0121827Site surfaced and sealed
Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in accordance with the approved plans and retained as such in perpetuity unless otherwise agreed in writing with the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0121827
-
Typology type: Policy
U0121828FRA
The development shall be carried out in accordance with the approved Flood Risk and Sequential Test Assessment (dated 17 July 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 4.4metres above Ordnance Datum (AOD). These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0121828
-
Typology type: Policy
U0121829Materials
Prior to their first use, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0121829
-
Typology type: Policy
U0121830Boundary Treatments
Prior to their first use, details of the proposed boundary treatments shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0121830
-
Typology type: Policy
U0121840In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Proposed Floor plans and elevations, drawing no. 23/161/001 - Revision E - Location and Proposed Site Plan, drawing no. 23/161/005 - Revision C - Flood Risk Assessment, amended version received 15/11/2023 - Flood Evacuation Plan, received 05/04/2024 - Air Quality Assessment (Viridian Air ref. VA-2024-508, dated 17th April 2024)
- Dataset
- Planning condition
- Reference
- U0121840
-
Typology type: Policy
U0121841Acoustic Assessment
1) Prior to commencement of the development, the applicant shall submit a report demonstrating the acoustic assessment and specified design criteria required to achieve the following standards, for approval by the local planning authority. All requirements contained within the approved report shall be implemented prior to first occupation of the apartments. A maximum noise level in the following locations of: - Living room/dining area - 35 dB LAeq, 16hr (07.00 - 23.00hrs) due to representative external ambient noise; - Bedroom (daytime resting) - 35 dB LAeq, 16hr (07.00-23.00hrs) due to representative external ambient noise; - Bedroom - 30 dB LAeq, 8hr (23.00 - 07.00hrs) and individual noise events not normally exceeding 45dB max (F time weighting) due to representative external ambient noise; These requirements shall be met with windows closed and alternative means of ventilation provided. 2) Prior to first occupation of the apartments, the applicant shall submit for approval to the local planning authority, a commissioning report demonstrating actual compliance with the above acoustic requirements. The report shall be approved by the local planning authority prior to first occupation of the apartments.