U0121752ROOF LIGHTS
The roof lights to be provided shall be low profile heritage roof lights with a central vertical glazing bar. Prior to commencement of works details of the type and make of the rooflights should be submitted to and approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0121752
-
Typology type: Policy
U0121814Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site/Block & Location Plans, BDS-2023-12-06 Rev D, received 06.02.2024 Street Scene + Tree Protection Zone, received 06.02.2024 Ground Floor Plan as Proposed, BDS-2023-12-02 Rev. D, received 06.02.2024 First Floor Plan as Proposed, BDS-2023-12-03 Rev. C, received 06.02.2024 Elevations as Proposed, BDS-2023-12-04 Rev. D, received 06.02.2024 Elevations as Proposed, BDS-2023-12-05 Rev. D, received 06.02.2024 Tree Protection Plan, received 27.03.2024
- Dataset
- Planning condition
- Reference
- U0121814
-
Typology type: Policy
U0121815materials
The external materials and finishes shall be in accordance with those detailed on the approved elevational drawings.
- Dataset
- Planning condition
- Reference
- U0121815
-
Typology type: Policy
U0121816TPP
The tree protection shall be carried out in complete accordance with the detail contained within the approved Tree Protection Plan by SelwynTrees, dated 27.03.2024.
- Dataset
- Planning condition
- Reference
- U0121816
-
Typology type: Policy
U0121817Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location plan received 07.09.23 Dwg. No. 00 0200 Rev P01 GA Elevations received 22.09.2023 Dwg. No. 100 00 SK1 Rev P03 Preliminary Sketch Plan Level 00 received 07.09.23 Dwg. No. 100 01 SK1 Rev P03 Preliminary Sketch Plan Level 01 received 07.09.23 Dwg. No. 100 01 SK1 Rev P01 Proposed sections received 07.09.23
- Dataset
- Planning condition
- Reference
- U0121817
-
Typology type: Policy
U0121818CMS
No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i. the site compound and parking of vehicles for site operatives and visitors ii. the erection and maintenance of security hoarding for the compound, if appropriate iii. Size, routing and numbers of abnormal loads with swept path analysis (as required) iv. the areas for loading and unloading of these materials even outside the prison if not being delivered directly into it. v. storage of plant and materials used in constructing the development if not being stored within the prison vi. wheel washing facilities unless all areas of construction are within existing hard standing areas
- Dataset
- Planning condition
- Reference
- U0121818
-
Typology type: Policy
U0121819Drainage
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.
- Dataset
- Planning condition
- Reference
- U0121819
-
Typology type: Policy
U0121820Seperate systems
The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed under condition 3.
- Dataset
- Planning condition
- Reference
- U0121820
-
Typology type: Policy
U0121821Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, received 27.06.2023 Site Plan, received 27.06.2023 Survey and Proposed Plans (23018-001 REV A), received 02.05.2024
- Dataset
- Planning condition
- Reference
- U0121821
-
Typology type: Policy
U0121822visibility
The visibility splays as shown on the approved plans shall be retained in perpetuity and shall remain clear of any obstruction over 900mm in height.
- Dataset
- Planning condition
- Reference
- U0121822