Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0121629

    Landscaping - Implement Landscape Plan

    The development hereby approved shall be carried out in accordance with the approved soft landscaping strategy (Dwg. No. 9425-SLS-01 Revision A) The works approved shall be carried out in the first planting and seeding season following completion of the development hereby permitted. Following the commencement of the scheme and before 30th September of year 1, 5 and 10, a Landscape Management Plan shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the hard and soft landscaping scheme has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next time period. It shall cover: species, size, location, planting and aftercare specification, and include an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, and before and after photos of any remedial plantings or completed works. Any trees or plants which, within a 5 year period from the date of planting die area removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.

    Reference
    U0121629
  • Typology type: Policy

    U0121630

    Materials and fencing

    Prior to installation of the structures, including battery containers, storage and utility containers, generators and transformers and fencing, details of the external finishing colour of all elements shall be agreed in writing by the Local Planning Authority. The structures and fencing shall be retained and maintained in the agreed finish for the lifetime of the development.

    Reference
    U0121630
  • Typology type: Policy

    U0121631

    Hard surfacing

    Prior to the first use of the site, details of the vehicular access, parking and turning areas for the site and how it is surfaced, drained and where necessary marked out shall be approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details and shall remain available for access for the lifetime of the development.

    Reference
    U0121631
  • Typology type: Policy

    U0121632

    CCTV

    Prior to its installation details of all CCTV infrastructure including height, colour and location of any mounted equipment shall be submitted to and agreed in writing by the Local Planning Authority.

    Reference
    U0121632
  • Typology type: Policy

    U0121633

    FRA

    The development shall be carried out in accordance with the submitted flood risk assessment Flood Risk Assessment by Eastwood Consulting Engineers, referenced 47920, Issue 4, dated 19 March 2024, and the following mitigation measures it details: o Finished floor levels of the battery storage containers, control and transformers shall be set no lower than a minimum of 600mm above adjacent ground levels. o As per Section 2.1.1, in the event of a breach of the main river defences, flood waters will be allowed to enter the site. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0121633
  • Typology type: Policy

    U0121634

    Construction hours

    No work relating to the construction of the development hereby approved, including works of demolition or preparations prior to operations shall take place before the hours of 0730 nor after 1800 Monday to Friday, before the hours of 0800 nor after 1300 on Saturdays nor on Sundays or recognised public holidays.

    Reference
    U0121634
  • Typology type: Policy

    U0121696

    Approved Plans

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Existing plans incl. site and location plan. Sheet 001. Revision A04. Date received: 15/04/2024. Proposed plans (rear extension). Sheet 002. Revision A04. Date received: 15/04/2024. Proposed plans (garage). Sheet 002. Revision A04. Date received: 15/04/2024.

    Reference
    U0121696
  • Typology type: Policy

    U0121749

    In accordance with plans specified

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Elevations: Drawing No. 06 (Revision B) as received 27/03/2024 Proposed Floor Plans: Drawing No. 05.1 (Revision B) as received 17/11/2023 Location Plan: Drawing No. 01 as received 18/09/2023 Site Plan: Drawing No. 02 as received 18/09/2023

    Reference
    U0121749
  • Typology type: Policy

    U0121750

    EXTERNAL ROOF MATERIALS AND BRICKS

    The external roof coverings and brickwork to be used on the construction of the extension should match existing roof tiles and bricks. Prior to the commencement of works details and samples of the roof tiles and bricks shall be submitted to and approved by the local planning authority. All new roof verges shall be mortared with no additional covering or boarding.

    Reference
    U0121750
  • Typology type: Policy

    U0121751

    WINDOWS

    Before the commencement of the relevant site works full details of the design, materials, construction and finish of any new doors and windows to the development hereby approved shall be submitted to and approved in writing by the local planning authority. Unless otherwise agreed in writing the details shall include an elevation of 1:20 scale of each window type and 1:5 scale cross section. Development shall be carried out in accordance with the approved details.

    Reference
    U0121751