Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0121599CEMP
Prior to the commencement of development activities, a Construction Environmental Management Plan shall be submitted to the LPA for approval, and then implemented in accordance with the approved details. The measures shall include: A risk assessment of the potentially damaging construction activities in relation to wildlife and habitats. A method statement for the protection of reptiles and other terrestrial fauna that may be encountered on site. The use of protective fencing, exclusion barriers and wildlife safety measures.
- Dataset
- Planning condition
- Reference
- U0121599
-
Typology type: Policy
U0121600Cycle storage
The development hereby permitted shall not be occupied until details of secure, enclosed cycle storage facilities for the development have been submitted to and approved in writing by the local planning authority. These facilities shall be fully implemented and made available for use prior to the occupation of the development hereby permitted and shall thereafter be retained for use at all times in accordance with those approved details.
- Dataset
- Planning condition
- Reference
- U0121600
-
Typology type: Policy
U0121601PROW
Prior to first occupation of the development hereby approved, the public right of way at the site's eastern boundary will be reinstated in full in accordance with the approved site plan. Prior to the relevant stage of works full details of the proposed boundary treatment will be submitted to the Local Authority for approval in writing. Approved details shall be implemented in full and retained for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0121601
-
Typology type: Policy
U0121602Retention and maintenance of hedgerow
The existing hedgerow at the site's front boundary shall be retained and not removed. It shall be maintained at a height of no more than 0.9m within 2m of the site access to maintain clear visibility to passing traffic on the highway.
- Dataset
- Planning condition
- Reference
- U0121602
-
Typology type: Policy
U0121609In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: Drawing No. DRB 1 as received 11.09.2023 Site Plan: Drawing No. DRB 4 as received 10.01.2024 Proposed Plans: Drawing No. DRB 3 as received 04.12.2023
- Dataset
- Planning condition
- Reference
- U0121609
-
Typology type: Policy
U0121610Materials
The external materials and finishes shall match the existing property unless otherwise indicated on the approved plans.
- Dataset
- Planning condition
- Reference
- U0121610
-
Typology type: Policy
U01216155 Year Limit
The development to which this permission relates must be begun not later than the expiration of five years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0121615
-
Typology type: Policy
U0121616Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Site Layout Rev 7 received 19.02.24 Landscape Strategy - 9425-SLS-01A received 29.08.23 Drained Areas - 47920-ECE-XX-XX-DR-C-0001-P04 received 20.03.24 Drainage Strategy - 47920-ECE-XX-XX-DR-C-0002-P05 received 20.03.24 Welfare & Storage Drawing Rev 1 received 29.08.23 Battery Container Details Drawing Raised 600mm Rev 1 received 29.08.23 PCS Inverter Unit Details Drawing Raised 600mm Rev 1 received 29.08.23 Switch Control Room Drawing Raised 600mm Rev 1 received 29.08.23 Transformer Drawing Raised 600mm Rev 1 received 29.08.23 Attenuation Tank Detail-Sheet 1 - 47920-ECE-XX-XX-DR-C-0008 received 20.03.24 Attenuation Tank Detail-Sheet 2 - 47920-ECE-XX-XX-DR-C-0009 received 20.03.24 Manhole Construction Details 47920-ECE-XX-XX-DR-C-0010 received 20.03.24 Hydro-brake Detail - 47920-ECE-XX-XX-DR-C-0011 received 20.03.24 Q-Brake installation E1-E01-067-A received 20.03.24 Anchor Bolt E1-M01-136-1-A - ACO VFC received 20.03.24 Drainage Maintenance Statement - Issue 1 47920-ECE-XX-XX-RP-C-0005 received 20.03.24 Defender SL3 Palisade received 20.03.24 Tree Protection Plan received 29.08.23
- Dataset
- Planning condition
- Reference
- U0121616
-
Typology type: Policy
U0121617Time limited - 35 years
The Battery Storage Facility shall be permitted for an operational life of 35 years only. Within 12 months from the expiry of this permission, or within 12 months of the site ceasing to be used, a detailed decommissioning strategy shall be submitted to and approved in writing by the Local Planning Authority. This strategy shall identify the trigger point(s) for decommissioning the site at which time the site shall be restored to its previous state as agricultural land. Decommissioning and restoration of the site shall thereafter be carried out and completed in full accordance with the details approved under this condition within 12 months of the expiry of the 35-year operational life following the date of this permission.
- Dataset
- Planning condition
- Reference
- U0121617
-
Typology type: Policy
U0121618Highways - CMS - Precom
No development shall take place until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority. The approved statement shall include the following: (a) the timetable of the works; (b) daily hours of construction; (c) any road closure or temporary traffic management on Fordstead Lane; (d) hours during which delivery and construction traffic will travel to and from the site, with such vehicular movements being restricted to between 8:00am and 6pm Mondays to Fridays inc.; 8.00am to 1.00pm Saturdays, and no such vehicular movements taking place on Sundays and Bank/Public Holidays unless agreed by the planning Authority in advance; (e) the number and sizes of vehicles visiting the site in connection with the development and the frequency of their visits; (f) the compound/location where all building materials, finished or unfinished products, parts, crates, packing materials and waste will be stored during the demolition and construction phases; (g) areas on-site where delivery vehicles and construction traffic will load or unload building materials, finished or unfinished products, parts, crates, packing materials and waste with confirmation that no construction traffic or delivery vehicles will park on the highway for loading or unloading purposes, unless prior written agreement has been given by the Local Planning Authority; (h) hours during which no construction traffic will be present at the site; (i) the means of enclosure of the site during construction works; (j) details of proposals to promote car sharing amongst construction staff in order to limit construction staff arriving from the west; (k) details of wheel washing facilities and obligations; (l) The proposed route of all construction traffic exceeding 7.5 tonnes; (m) Details of the amount and location of construction worker parking; (n) Photographic evidence of the condition of adjacent public highway prior to commencement of any work; (o) no mud, stones, water or debris shall be deposited on the public highway at any time; (p) methods of communicating the CMS to staff, visitors and neighbouring residents and businesses; (q) Commitment to providing a responsible person to join a construction traffic liaison committee. The approved CMS shall be adhered to throughout the demolition/construction period.
- Dataset
- Planning condition
- Reference
- U0121618