Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0121375Septic Tank
Each dwelling shall be provided with its own septic tank, details of which shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development.
- Dataset
- Planning condition
- Reference
- U0121375
-
Typology type: Policy
U0121376Piped Water course
No building shall be erected within 10 metres of the piped water course which passes through/runs adjacent to the site.
- Dataset
- Planning condition
- Reference
- U0121376
-
Typology type: Policy
U0121417Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9001 Revision P06 Site Masterplan received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9008 Revision P08 Site landscape plan - West area received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9009 Revision P10 Site landscape plan - North area received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9010 Revision P10 Site landscape plan - South area received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9011 Revision P05 Green Infrastructure Strategy Plan received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9015 Revision P07 Planting Plan received 25.03.24 Dwg. No. SRP1044-DHL-XX-XX-T-L-9020 Revision P04 Landscape / External Works Specification received 25.03.24 Dwg. No. SRP1044-DHL-XX-XX-T-L-9021 Revision P02 13/03/24 - Clause Q35 Litter collection added received 15.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9050 Revision P02 Retaining Wall to access road received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9051 Revision P01 Retaining Wall / Seating Wall to PSBP block received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9053 Revision P03 Landscape canopies with photo voltaic panels received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9054 Revision P01 Hard paving and fencing details received 12.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9055 Revision P01 Soft landscape details received 12.03.24 Dwg. No. SRP1044-BBA-ZZ-00-D-A-2010 Ground Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-01-D-D-2011 First Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-02-D-A-2012 Second Floor - Planning 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-RF-D-A-2004 Roof Plan P09 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3001 GA Elevations - Sheet 1 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3002 GA Elevations - Sheet 2 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-3003 GA Elevations - Sheet 3 P07 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-4001 GA Sections - Sheet 1 P04 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-4002 GA Sections - Sheet 2 P04 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9001 External Visuals Sheet 1 P03 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9002 External Visuals Sheet 2 P03 received 25.03.24 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9004 Existing Buildings 01 received 09.11.23 Dwg. No. SRP1044-BBA-ZZ-ZZ-D-A-9007 Street Scene & Context Study 02 received 16.02.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9004 P05 Secure Line Strategy received 25.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9007 P02 Site Sections received 25.03.24 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9012 P01 Existing and Proposed Levels received 09.11.23 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9100 P01 Site location plan received 13.11.23 Dwg. No. SRP1044-DHL-ZZ-ZZ-D-L-9102 P03 Site location plan and existing site plan received 09.11.23 Dwg. No. SRP1044-BAM-XX-XX-T-X-0002 P01 External Finishes Schedule received 25.03.24
- Dataset
- Planning condition
- Reference
- U0121417
-
Typology type: Policy
U0121418Temporary Car Park - 4 year permission
The temporary car park as shown on the approved plans shall be retained for a maximum of 4 years from the date of this planning permission. The Local Planning Authority shall be informed no later than 7 days prior to first use. Within 6 months from the date of development being completed or should any part of the site cease to be required for construction purposes, a scheme of restoration shall be submitted to the Local Planning Authority to be approved in writing. The scheme shall detail: A photographic record of the site prior to construction of the temporary car park, How the site is to be returned to its prior condition, and; Details of landscaping and aftercare The scheme of restoration shall be carried out in accordance with the agreed details within the first available planting season following the approval of details by the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0121418
-
Typology type: Policy
U0121419Highways - CTMP
Prior to the commencement of development, a Construction Method Statement, Site Management and Environmental Plan shall be submitted to and approved in writing by the Local Planning Authority, and which shall include for the following; a) location of site compound and plant equipment/storage; b) the means of access, storage and parking/holding areas (including workforce parking), means of loading and unloading of all contractor's plant, equipment, materials and vehicles and associated traffic management measures; c) measures to control the emissions of dust, dirt and noise during construction; d) the methods to be employed to prevent mud, grit and dirt being carried onto the public highway from the development hereby approved; e) avoidance of water or mud run off; f) construction working hours and management of deliveries, including delivery routes; The development shall thereafter be constructed and managed in accordance with the approved details
- Dataset
- Planning condition
- Reference
- U0121419
-
Typology type: Policy
U0121420Drainage - Drainage imp. and Main Plan
No part of the development shall be brought into use until the drainage scheme has been completed in accordance with the approved details. Prior to the first occupation of the teaching block hereby approved, details of a drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.
- Dataset
- Planning condition
- Reference
- U0121420
-
Typology type: Policy
U0121421Community Use Scheme
Prior to the first occupation of the teaching block, a Community Use Scheme shall be submitted to and approved in writing by the Local Planning Authority. The Scheme shall include details of pricing policy, hours of use, access by non-school users/non-members, management responsibilities and include a mechanism for review. The approved Scheme shall be implemented upon commencement of use of the development.
- Dataset
- Planning condition
- Reference
- U0121421
-
Typology type: Policy
U0121422Ecological Management and Monitoring Pla
Prior to the commencement of development, a Bio-diversity Plan (BNG Plan) for proposed onsite habitats shall be submitted to the Local Planning Authority for approval in writing. The BNG Plan shall be based on the proposals set out in the BNG report of November 2023 (BSG Ref: P22-631) and detail the following: The baseline biodiversity assessment against which the delivery of 14.77 biodiversity habitat units and 1.24 biodiversity hedgerow units n uplift in biodiversity unit value of 0.31 Habitat units will be monitored. The project's biodiversity unit targets. A detailed adaptive management plan setting out how habitats will be created or enhanced and describing the proposed ongoing management for a minimum of 30 years. The details of when target condition will be achieved and how it shall be maintained. A detailed monitoring plan that will be used to inform any potential changes to the ongoing management and assess the progress towards achieving target condition. This should outline the surveys that will be used to inform condition monitoring reports. Monitoring reports will be provided to the Local Planning Authority by the end of years 1,2,5,10,20, and 30 of the monitoring period. The roles, responsibilities and professional competencies of the people involved in implementing and monitoring the biodiversity net gain delivery. Evidence that the necessary resources are available to deliver the proposed biodiversity net gain plan and the ongoing management. Once approved the Management and Monitoring Plan shall be implemented in full and any subsequent changes to management as a result of findings from the monitoring agreed in writing with the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0121422
-
Typology type: Policy
U0121423Ecological Enhancement Plan
Within 12 months of the first use of the teaching block hereby approved, the ecology enhancement measures as shown within the submitted ecological enhancement plan dated 31.02.24 prepared by BSG Ecology shall be implemented in full.
- Dataset
- Planning condition
- Reference
- U0121423
-
Typology type: Policy
U0121424Landscaping Implementation
Following the commencement of the development and before 30th September of every year during the implementation period (either phased or in full) and 5 year aftercare period, a 'Landscaping Implementation Report' shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the landscaping has been carried out in full accordance with the approved plans shown in condition 2. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next 12 months. It shall cover the following matters in particular, but not limited to, species, size, location, planting and aftercare specification, and be illustrated with evidence such as an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, before and after photos of any remedial plantings or completed works. If required, the developer shall arrange to attend a site meeting with the Local Planning Authority to inspect the planting and ongoing maintenance requirements.
- Dataset
- Planning condition
- Reference
- U0121424