Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0120730

    Rainwater goods

    Any replacement/new rainwater goods, bargeboards and fascias shall be black unless otherwise agreed in writing by the Local Planning Authority.

    Reference
    U0120730
  • Typology type: Policy

    U0120731

    Services

    Prior to commencement of relevant works full details of the design, size, location, materials and colour of all flues and vents (including any roof insulation vents, heating and plumbing vents, and air extract vents) and of all meter boxes to be used in the conversion of the building shall be submitted to and approved in writing by the Local Planning Authority. Works shall be carried out in accordance with the approved details.

    Reference
    U0120731
  • Typology type: Policy

    U0120732

    Noise

    The development shall be provided with a Mechanical Ventilation with Heat Recovery (MVHR) system throughout, and no trickle vents shall be fitted to any windows. All studio apartments and bedrooms throughout the development shall be provided with glazing rated at least 45 dB Rw+Ctr and with octave band sound reduction values of at least 32 dB Rw at 63 Hz and 28 dB Rw at 125 Hz. All remaining habitable rooms (living/kitchen spaces) shall be provided with enhanced double glazing rated at least 30 dB Rw+Ctr. Internal noise levels due to mechanical ventilation plant shall not exceed 26 dB(A) in bedrooms and 30 dB(A) in living rooms. A commissioning report demonstrating compliance with the above shall be submitted for approval to the LPA, prior to first occupation of the flats, and occupation shall not be permitted until such report is approved.

    Reference
    U0120732
  • Typology type: Policy

    U0120760

    Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: 23-040-02 Rev A Site Plan received 18.01.24 23-040-04 Plot 3 received 21.06.23 23-040-03 Plots 1-2 & 4-5 received 21.06.23

    Reference
    U0120760
  • Typology type: Policy

    U0120761

    DRAINAGE DETAILS

    The surface water sustainable system (SuDS) as shown within the approved drainage design strategy (produced by J Roberts) shall be designed and installed on the approved development. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. In the event that a SuDS compliant design is not reasonably practical, then the developer shall seek written approval from the local planning authority for an alternative system prior to bringing the development into use.

    Reference
    U0120761
  • Typology type: Policy

    U0120762

    drainage management and maintenance plan

    Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.

    Reference
    U0120762
  • Typology type: Policy

    U0120763

    TREE PROTECTION

    The development hereby granted shall not be commenced nor materials or machinery brought onto the site until the trees which it has been agreed shall be retained are fenced off to the satisfaction of the Local Planning Authority. A scheme of fencing shall be submitted to the Local Planning Authority which shall comply with B.S. Specification No. 5837 'Trees in relation to Construction (1991)', with the Council's 'Code of Practice in Relation to Trees on Development Sites' and with the Council's illustrated guidelines 'Protection of Trees on Development Sites'. The satisfactory implementation of the scheme on the site shall be confirmed in writing by the Local Planning Authority before any works are begun.

    Reference
    U0120763
  • Typology type: Policy

    U0120764

    Construction Method Statement

    No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i) - the parking of vehicles of site operatives and visitors ii) - loading and unloading of plant and materials iii) - storage of plant and materials used in constructing the development iv) - the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v) - wheel washing facilities vi) - measures to control noise and the emission of dust and dirt during construction vii) - a scheme for recycling/disposing of waste resulting from demolition and construction works

    Reference
    U0120764
  • Typology type: Policy

    U0120765

    LANDSCAPING BNG Delivery

    No development shall take place on the site until details of a landscaping/planting scheme have been agreed in writing with the Local Planning Authority including the measures set out Revised Biodiversity Impact Assessment P2826 / 0324 - 02 by CBE consulting dated 28 March 2024 in order to achieve the requirements of Bio Diversity Net Gain. This includesbut not limited to the planting of shrubs and up to 7 native trees. This scheme shall indicate all existing trees and hedgerows on the site, showing their respective size, species and condition. It shall distinguish between those which are to be retained, those proposed for removal and those requiring surgery. The scheme should also indicate, where appropriate, full details of new or replacement planting. All planting material included in the scheme shall comply with Local Planning Authority's 'Landscape Specifications in Relation to Development Sites'. Planting shall take place in the first suitable planting season, following the commencement of the development. Any tree or shrub planted in accordance with the scheme and becoming damaged, diseased, dying or removed within five years of planting shall be replaced in accordance with the above document.

    Reference
    U0120765
  • Typology type: Policy

    U0120810

    Amended plans

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Drawing Title: Proposed Elevations Site Plan and Site Location Plan. Drawing No: 02. Rev: 02. Received by City of Doncaster Council on the 13.03.2024. Drawing Title: Proposed Plans Drawing No: 01. Rev: 02. Received by City of Doncaster Council on the 13.03.2024.

    Reference
    U0120810