Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0120422

    Method Statements

    Prior to the commencement of development, a Method Statement relating to works adjacent the railway boundary shall be submitted to and approved in writing by the local planning authority. This should include an outline of the proposed method of construction, risk assessment in relation to the railway and construction traffic management plan. Where appropriate an asset protection agreement will have to be entered into. Where any works cannot be carried out in a fail-safe manner, it will be necessary to restrict those works to periods when the railway is closed to rail traffic i.e. possession which must be booked via Network Rail's Asset Protection Project Manager and are subject to a minimum prior notice period for booking of 20 weeks. If excavations/piling/buildings are to be located within 10m of the railway boundary a method statement should be submitted for approval by NR. The works shall be carried out in accordance with the approved details. Once planning permission has been granted and at least six weeks prior to works commencing on site the Asset Protection Project Manager (OPE) MUST be contacted by the developer. The OPE will require to see any method statements/drawings relating to any excavation, drainage, demolition, lighting and building work or any works to be carried out on site that may affect the safety, operation, integrity and access to the railway.

    Reference
    U0120422
  • Typology type: Policy

    U0120423

    SY Super Fast Broadband

    Upon commencement of development details of measures to facilitate the provision of gigabit-capable full fibre broadband for the dwellings/development hereby permitted, including a timescale for implementation, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

    Reference
    U0120423
  • Typology type: Policy

    U0120482

    Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Received 11.03.2024 Site Plan, PY4449-004, Rev. A Received 08.03.2023 - Location Plan - Elevations, PY4334/B001 - Proposed Free-Standing Unit: Specification

    Reference
    U0120482
  • Typology type: Policy

    U0120712

    plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: 3936-02J - Proposed

    Reference
    U0120712
  • Typology type: Policy

    U0120713

    Windows and Doors

    Prior to commencement of relevant works details of any new and/or replacement windows and doors/gates shall be submitted to and approved in writing by the Local Planning Authority. Details shall be provided for each window and door type and windows to be fully working vertically sliding sash windows unless otherwise agreed in writing by the Local Planning Authority. Windows to be white/off-white and doors/gates to be black or a traditional dark colour. Works shall be carried out in accordance with approved details.

    Reference
    U0120713
  • Typology type: Policy

    U0120714

    Brickwork

    Prior to commencement of relevant works details of making good of brickwork following the insertion of new doors and removal/remodelling/blocking of existing openings including the removal of the stone cladding to the current front door to the property shall be submitted to and approved in writing by the Local Planning Authority. The blocking of openings shall be in recess. Samples of the bricks to be used in blocking up of openings, the making good of brickwork, to form the bin enclosure and to be used for the new walls shall match existing and be provided on site for the inspection of and approved in writing by the Local Planning Authority. Works shall be carried out in accordance with approved details.

    Reference
    U0120714
  • Typology type: Policy

    U0120715

    Roof

    Prior to commencement of relevant works samples of any replacement roof covering shall be provided on site for the inspection of and approved in writing by the Local Planning Authority. Any replacement of covering shall be natural slate to match existing. Works shall be carried out in accordance with approved details.

    Reference
    U0120715
  • Typology type: Policy

    U0120716

    Rainwater goods

    Any replacement/new rainwater goods, bargeboards and fascias shall be black unless otherwise agreed in writing by the Local Planning Authority.

    Reference
    U0120716
  • Typology type: Policy

    U0120717

    Services

    Prior to commencement of relevant works full details of the design, size, location, materials and colour of all flues and vents (including any roof insulation vents, heating and plumbing vents, and air extract vents) and of all meter boxes to be used in the conversion of the building shall be submitted to and approved in writing by the Local Planning Authority. Works shall be carried out in accordance with the approved details.

    Reference
    U0120717
  • Typology type: Policy

    U0120718

    Landscaping

    No development shall take place on the site until a detailed hard and soft landscape scheme based on the approved Site Masterplan (drawing 3936-02J) has been submitted to and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a detailed specification for tree pit construction for the trees within highway that utilises a professionally recognised method of construction to provide the minimum rooting volume set out in the Council's guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation, and with details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping must be implemented in full accordance with the approved scheme, prior to occupation of the apartments, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0120718