Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0120161approved details
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications: PLOTS 1,2 AND 3 GARAGE PLAN AND ELEVATIONS 21-05-107 PROPOSED DRAINAGE PLAN 200 Rev 08 PROPOSED SITE PLAN 21-05-100 REV 10 PROPOSED HOUSE TYPE A 21-05-101 01 PROPOSED HOUSE TYPE B 21-05-103 02 PROPOSED HOUSE TYPE C 21-05-105 01 PROPOSED SITE SECTIONS 21-05-104 Rev 01 Biodiversity Enhancement Plan (Estrada Ecology 25th April 2023) Construction Traffic Management Plan Appendix 4 Transport Management Plan Appendix 2 Arboricultural Method Statement and Planting Plan dated 22nd December 2022
- Dataset
- Planning condition
- Reference
- U0120161
-
Typology type: Policy
U0120162VEHICLE MARKED OUT
Before the development is brought into use, that part of the site to be used by vehicles shall be surfaced, drained and where necessary marked out in a manner to be approved in writing by the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0120162
-
Typology type: Policy
U0120163VEHICLE TURNING SPACE
The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such.
- Dataset
- Planning condition
- Reference
- U0120163
-
Typology type: Policy
U0120164BEP
The details provided within the Biodiversity Enhancement Plan (Estrada Ecology 25th April 2023) shall be fully implemented prior to occupation of the development. Monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, , 5, 10, , 20, and 30) immediately following habitat creation.
- Dataset
- Planning condition
- Reference
- U0120164
-
Typology type: Policy
U0120165Con 2B
Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0120165
-
Typology type: Policy
U0120166No piped discharged
Unless otherwise approved in writing by the Local Planning Authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.
- Dataset
- Planning condition
- Reference
- U0120166
-
Typology type: Policy
U0120167Parking
Before the development hereby permitted is brought into use, the parking as shown on the approved plans shall be provided. The parking area shall not be used otherwise than for the parking of private motor vehicles belonging to the occupants of and visitors to the development hereby approved.
- Dataset
- Planning condition
- Reference
- U0120167
-
Typology type: Policy
U0120168Planting details
The landscaping and tree protection details provided within the 'Arboricultural Method Statement and Planting Plan dated 22nd December 2022 shall be implemented in full prior to the occupation of the dwellings. Any part of the scheme planting which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0120168
-
Typology type: Policy
U0120181Accordance with Plans Specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 12/05/2023 Site Plan: as received 27/07/2023 Proposed Plans: as received 21/03/2023
- Dataset
- Planning condition
- Reference
- U0120181
-
Typology type: Policy
U0120182Render
Within 3 months of the date of this decision, the outbuilding hereby approved shall be finished in white render as per the approved plans.
- Dataset
- Planning condition
- Reference
- U0120182