Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0118623

    WSI - AREAS G AND J ONLY

    No development, including any demolition and groundworks, shall take place on site below 7.5maOD in Areas G or J as defined in the desk-based assessment (DBA) by York Archaeology submitted with the application until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: o The programme and method of site investigation and recording. o The requirement to seek preservation in situ of identified features of importance. o The programme for post-investigation assessment. o The provision to be made for analysis and reporting. o The provision to be made for publication and dissemination of the results. o The provision to be made for deposition of the archive created. o Nomination of a competent person/persons or organisation to undertake the works. o The timetable for completion of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.

    Reference
    U0118623
  • Typology type: Policy

    U0118624

    Conservation - Security for Pump Station

    The boundary treatments surrounding the former pumping station as shown within the approved landscape masterplan (Landscape Diagrams - Rev07) shall be implemented prior to the opening of the site to the public (as defined under condition1). The boundary treatment shall be retained whilst the site is in public use unless removed by any subsequent grant of planning permission.

    Reference
    U0118624
  • Typology type: Policy

    U0118625

    Construction Hours

    Construction, loading and unloading on the site shall not take place outside of the hours of 8:00 to 18:00 Monday to Friday and 9:00 to 13:00 Saturday. There shall be no construction, loading and unloading at any time on Sundays and public holidays. No construction activities shall be accessed from Don Street, Whittington Street or Parkinson Street.

    Reference
    U0118625
  • Typology type: Policy

    U0118626

    EA - FRA

    The development shall be carried out in accordance with the submitted flood risk assessment (ref December 2022 - JBA Consulting - Doncaster Waterfront) and the following mitigation measures it details: There shall be no ground level raising as a result of the remediation works These mitigation measures shall be fully implemented prior to the use first commencing and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.

    Reference
    U0118626
  • Typology type: Policy

    U0118627

    Yorkshire Water - Outfall

    No piped discharge of surface water from the application site shall take place until works to provide a satisfactory outfall, other than the existing local public sewerage, for surface water have been completed in accordance with details submitted to and approved by the Local Planning Authority.

    Reference
    U0118627
  • Typology type: Policy

    U0118628

    Landscape Management Plan

    The development shall be carried out in accordance with the agreed Landscape Management Plan (Issue Number P02) prepared by Pick Everard. Any part of the approved details which fail, are damaged or removed within five years of implementation shall be replaced within 4 weeks (for hard landscaping) or during the next available planting season (for soft planting).

    Reference
    U0118628
  • Typology type: Policy

    U0118629

    Amended Plans

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed site plan - drawing no 023/079/PSP/C - amended 13/11/2023 Proposed floor plans - drawing no 023/079/PD P1/A - amended 13/11/2023 Proposed elevations - drawing no 023/079 PE P1/A - amended 13/11/2023 Street scene drawing - drawing no 023/079/P1LPSSC/A - amended 13/11/2023 Proposed garage drawing - drawing no 023/079/DGD - received 14/11/2023

    Reference
    U0118629
  • Typology type: Policy

    U0118630

    Landscaping

    No development shall take place on the site until a detailed soft landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include a soft landscape plan, a schedule providing plant and tree numbers and details of the species, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs, and BS8545:2014 Trees: from nursery to independence in the landscape; a specification of planting and staking/guying; a timescale of implementation and details of aftercare for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion of the planting. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme unless the local planning authority gives its written approval to any variation.

    Reference
    U0118630
  • Typology type: Policy

    U0118631

    Ecological Enhancements

    Within two months of the commencement of development, an ecological enhancement plan shall be submitted to the local planning authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented prior to the first occupation of the site or an alternative timescale to be approved in writing with the local planning authority: Photographic evidence of implementation must be submitted to the Local Planning Authority. 1 x bat box of the Vivaro Pro Build-In Bat Tube type or similar to be located in accordance with instructions from a suitably qualified ecologist. 1x swift box of the integrated WoodStone type or similar to be located in accordance with instructions from a suitably qualified ecologist. Small mammal access holes 13x13cm to be located on two sides in any fencing erected

    Reference
    U0118631
  • Typology type: Policy

    U0118632

    Obscure glazing

    Before the first occupation of the building hereby permitted, the windows(s) at the first floor, indicated as bathroom and ensuites on the approved floor plan shall be fitted with obscured glazing and shall be permanently retained in that condition thereafter.

    Reference
    U0118632