Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0118608

    obscure glazing

    The first floor bathroom/shower room windows on the rear elevation shall be glazed using obscured glass to a minimum of level 3 of the Pilkington scale of obscuration and shall remain so glazed for the lifetime of the development.

    Reference
    U0118608
  • Typology type: Policy

    U0118614

    Time limit

    The site shall be in use as public open space for a maximum period of 5 years from the date it is first made available to the public. The Local Planning Authority shall be informed of the opening date prior to first use commencing. Within 6 months from the date of this expiry or should any part of the site cease to be used as public open space before that date, a scheme of restoration shall be submitted to the Local Planning Authority to be approved in writing. The scheme shall include details of the following measures: Landscaping Equipment Easement areas to existing site constraints Boundary treatments Maintenance strategy The scheme of restoration shall be carried out within the first available planting season following the approval of details by the Local Planning Authority. The scheme shall be carried out and maintained in accordance with the agreed details.

    Reference
    U0118614
  • Typology type: Policy

    U0118615

    Approved plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location plan received 30.10.23 Doncaster Waterfront Site Remediation Landscape Diagrams Rev 07 received 16.01.24 Design and Access Statement received 30.10.23 Design and Access Statement Addendum received 16.01.24

    Reference
    U0118615
  • Typology type: Policy

    U0118616

    Contamination - Remediation

    All remedial works shall be in accordance with the Remediation Strategy & Verification Plan (GJ263 (03) R002 RSVP. Oct 2022 & GJ263 Doncaster Waterfront - Specification for Cover Layer. GJ263(05)-L001. January 2023). a) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. Where necessary, the remediation works within the locations as identified within the submitted Waterfront Site Remediation - Utilities Report shall be subject to bespoke remediation measures set out in a remediation works addendum to be submitted to and approved in writing by the Local Planning Authority. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which falls outside the scope of the agreed Remediation Strategy & Verification Plan, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. b) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.

    Reference
    U0118616
  • Typology type: Policy

    U0118617

    Construction Management Plan inc. hi,eho

    No development, including any works of demolition, shall take place on site until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: 1. The site compound and parking of vehicles for site operatives and visitors 2. Identification of agreed access points and routing from the Classified road network 3. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) 4. Contract duration 5. The areas for loading and unloading of plant and materials 6. Storage of plant and materials used in constructing the development 7. The location, erection and maintenance of any security hoarding to be installed 8. Wheel washing facilities (location and type) 9. Temporary signage on the adopted highway 10. Assessment of impact and measures to control noise and vibration from site activities 11. Assessment of impact and measures to control the emission of dust, mud and dirt from the site 12. Assessment of impact and measures to control the emission of volatile organic compounds and odour from the site 13. Details of artificial lighting and mitigation measures 14. Complaints procedure - to detail how a contact number will be advertised to the public, investigation procedure when a complaint is received, any monitoring to be carried out, and what will happen in the event that the complaint is not resolved. The development must be carried out in accordance with the Construction Traffic Management Plan for the lifetime of the development.

    Reference
    U0118617
  • Typology type: Policy

    U0118618

    CEMP

    Prior to the commencement of development, a Construction Environmental Management Plan (CEMP) relating to biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall cover badgers, bats, birds, amphibians, other terrestrial mammals and reptiles, and shall include: i) A risk assessment of construction activities in relation to wildlife and habitats informed by the submitted surveys carried out by ECUS ltd and updated protected species surveys where necessary; ii) Details of all reasonable avoidance measures to be employed on the site; iii) A lighting plan detailing the specification, location and orientation of the proposed external lighting to avoid disturbance or adverse effects on light-sensitive species, including bats; iv) An invasive species management plan relating to Himalayan Balsam, Buddleia and Horsetail; v) The use of protective fencing and wildlife safety measures clearly marked on site plans; vi) Temporary surface water controls to ensure that no surface water generated during construction of the development are discharged to ground; vii Details of any liquid storage tanks and necessary mitigation measures. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. viii) Plans for a record to be kept by an Ecological Clerk of Works of operations and monitoring activities carried out under the CEMP. This record shall be made available to the Local Planning Authority on request both during and after the construction period. The development shall thereafter be implemented in accordance with the approved CEMP.

    Reference
    U0118618
  • Typology type: Policy

    U0118619

    Drainage - DA01

    No development shall take place on site until details of foul and surface water systems, including outfall and maintenance, and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority (LPA). These details shall include a drainage management and maintenance plan. These works shall be carried out concurrently with the development prior to first use by members of the public as outlined under condition 1.

    Reference
    U0118619
  • Typology type: Policy

    U0118620

    Habitat Management and Maintenance Plan

    Upon the commencement of development, the development shall be carried out in accordance with the agreed Habitat Management and Maintenance Plan (HMMP) prepared by Ecus ltd. Monitoring reports shall be provided to the Local Planning Authority by the end of years 1,2,5,10,20, and 30 of the monitoring period. The HMMP shall be implemented in full and any subsequent changes to management as a result of findings from the monitoring shall be agreed in writing with the Local Planning Authority.

    Reference
    U0118620
  • Typology type: Policy

    U0118621

    Public Realm Design

    Prior to the construction of any areas of public realm, details of all external works shall be submitted to and approved in writing by the Local Planning Authority (LPA). Unless otherwise agreed with the LPA, this information should include the following details for all areas within the red line boundary: - Soft landscape details- species stock and planting spec, - Hard landscape- surface materials, play equipment, lawn edge design, paving pattern, planters, bins, seating, lighting - Boundaries, security and walling - boundary treatment, gates,, screen fencing details, security measures; - Way-finding and signage - road markings, locations and designs for signs, information points and way-finding posts; The development must take place in accordance with the approved details. Any part of the approved details which fail, are damaged or removed within five years of implementation shall be replaced within 4 weeks (for hard landscaping) or during the next available planting season (for soft planting).

    Reference
    U0118621
  • Typology type: Policy

    U0118622

    Landscaping

    Prior to the construction of any areas of public realm, a detailed hard and soft landscape scheme based on the approved landscape masterplan (Landscape Diagrams - Rev07) must be submitted and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials, including adoptable highway finishes and footpaths through the POS. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a specification for planting including details of tree support, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway/pedestrian area within the site. Soft landscaping must be implemented in full accordance with the approved scheme, prior to occupation/use of the site, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0118622