Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0118583Lighting
On or before submission of a reserved matters application for each phase of development, a lighting design strategy that specifically responds to light sensitive biodiversity shall be submitted to and approved in writing by the local planning authority. The strategy shall use current best practice on lighting and the protection of light sensitive fauna and include: i) Identification and assessment of the likely presence and location of light sensitive ecological receptors based on survey baseline data in relation to the proposed developments within the site, or part thereof. ii) Provide for mitigation measures along with technical specifications to reduce /eliminate the impacts of lighting spill on ecological receptors unless otherwise agreed. The approved lighting design strategy for the site or part thereof shall be implemented and complied with.
- Dataset
- Planning condition
- Reference
- U0118583
-
Typology type: Policy
U0118584Biodiversity Method Statement
On or before submission of the reserved matters application for each phase of development, a Biodiversity Method Statement (BMS) including a Biodiversity Mitigation, Monitoring, and Enhancement Plan (BMMEP) shall be submitted and approved in writing by the Local Planning Authority. The BMS and BMMEP shall include; i) an assessment of baseline conditions set out in the ecological reports and species surveys submitted with the outline application and associated appendices to ensure they are fit for purpose and to identify any additional survey work required to make them as such. ii) a timetable for survey updates set against the proposed development phasing and the inclusion of contingency measures where there are identified as potentially required for sensitive operations. iii) the purpose and objectives of the proposed works based on mitigation and compensation measures outlined in biodiversity offsetting proposals, ecological reports and species surveys submitted with the outline application. iv) scale and location of the proposed works shown clearly on scaled maps and plans v) Identification of the mitigation and/or compensation areas and features within the site vi) detailed specifications for biodiversity creation and enhancement works and other ecological features specific to mitigation proposals for habitats, faunal groups and species. vii) timetable for the implementation based on the phasing proposals. viii) Initial aftercare and long-term management and maintenance of ecological features including an appropriate monitoring strategy.
- Dataset
- Planning condition
- Reference
- U0118584
-
Typology type: Policy
U0118585Flood Resilience
No phase of development approved by this planning permission shall commence until a scheme to ensure the development is flood resilient has been submitted to, and approved in writing by, the local planning authority. The applicant must ensure the development is flood resilient by specifying all finished floor levels and additional flood resilience measures for the development across the site. The scheme shall be fully implemented and subsequently maintained, in accordance with the scheme's timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0118585
-
Typology type: Policy
U0118586Design Guide
The design guide dated March 2020 shall inform all subsequent reserved matters submissions for development within the site unless otherwise agreed in writing with the local planning authority.
- Dataset
- Planning condition
- Reference
- U0118586
-
Typology type: Policy
U0118587106 requirements
No material operation as defined in Section 56 (4)(a)-(d) of the Town and Country Planning Act 1990, shall be carried out to commence the development pursuant to this planning permission, until a planning obligation pursuant to Section 106 of the said Act relating to the land has been completed. The said planning obligation will provide for: A) 23 per cent affordable housing provided in accordance with a timetable agreed with the local planning authority. B) Public open space to the equivalent of 15 per cent of the total site area and provision of a locally equipped area of play and maintenance plan in accordance with a scheme and timetable to be agreed. C) Contribution to the West Moor Link improvement scheme of £345,578. D) Monitoring of trip rates for a period of 5 years and a transport bond of £144.87 per dwelling. E) Provision of a bus shelter on Doncaster Road or a payment of £10,000 in lieu of this. F) A contribution of £851.46 per dwelling towards education.
- Dataset
- Planning condition
- Reference
- U0118587
-
Typology type: Policy
U0118588Noise mitigation
Prior to the construction of any dwellings within each phase of the development, a scheme for additional ventilation/glazing and acoustic fencing within that phase, based on the recommendations of the submitted noise survey (Table 4.3 of the WYG noise report Ref: A108704, dated 15th October 2018) shall be submitted to and approved in writing by the local planning authority. Implementation of the approved scheme shall take place prior to the occupation of any houses within that phase.
- Dataset
- Planning condition
- Reference
- U0118588
-
Typology type: Policy
U0118589Archaeology
The development shall be carried out in accordance with the Written Scheme of Investigation by maparch (reference VC-4.10.23).
- Dataset
- Planning condition
- Reference
- U0118589
-
Typology type: Policy
U0118590Biodiversity Offsetting
On submission of any reserved matters applications, a scheme for Biodiversity Offsetting shall be submitted to the LPA. This scheme must apply the mitigation hierarchy and identify the residual impacts that must be compensated for. Using the LPA's or Defra's Biodiversity Offsetting Process, the conservation credits and a means of delivering them either on site or off site shall be submitted for written approval by the LPA. Development shall be carried out in accordance with the approved scheme.
- Dataset
- Planning condition
- Reference
- U0118590
-
Typology type: Policy
U0118606Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Existing Plans including Site and Location Plan. Drawing number: AD_001. Revision 'P1'. Date received: 13/12/2023. Proposed Plans including Site and Location Plan. Drawing number: AD_002. Revision 'P2'. Date received: 13/12/2023.
- Dataset
- Planning condition
- Reference
- U0118606
-
Typology type: Policy
U0118607In accordance with plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: FLOOR PLANS AND ELEVATIONS AS PROPOSED 22028 102 SITE LOCATION PLAN 22028 103
- Dataset
- Planning condition
- Reference
- U0118607