Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0118432

    Bare brickwork

    Brickwork adjoining the ground floor and upper floor corridors within the extension hereby granted shall remain exposed from finished floor level to ceiling level.

    Reference
    U0118432
  • Typology type: Policy

    U0118465

    Implementation

    The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.

    Reference
    U0118465
  • Typology type: Policy

    U0118466

    Approved Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing Location Plan - Concept Plans and Elevations (23006-001 Rev A)

    Reference
    U0118466
  • Typology type: Policy

    U0118467

    Contamination CON2

    Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been submitted to and approved in writing by the LPA.

    Reference
    U0118467
  • Typology type: Policy

    U0118468

    Contamination CON3

    Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.

    Reference
    U0118468
  • Typology type: Policy

    U0118469

    Drainage Details (DA01)

    The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.

    Reference
    U0118469
  • Typology type: Policy

    U0118470

    Drainage (Watercourse Compliance)

    No building shall be erected within 10 metres of the piped water course which passes through/runs adjacent to the site.

    Reference
    U0118470
  • Typology type: Policy

    U0118471

    Archaeology WSI

    No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: - The programme and method of site investigation and recording. - The requirement to seek preservation in situ of identified features of importance. - The programme for post-investigation assessment. - The provision to be made for analysis and reporting. - The provision to be made for publication and dissemination of the results. - The provision to be made for deposition of the archive created. - Nomination of a competent person/persons or organisation to undertake the works. - The timetable for completion of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.

    Reference
    U0118471
  • Typology type: Policy

    U0118472

    External Materials

    Prior to the commencement of the above ground works, details or samples of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall thereafter be carried out in accordance with the approved materials.

    Reference
    U0118472
  • Typology type: Policy

    U0118473

    Biodiversity Net Gain

    Prior to the commencement of development, a Management and Monitoring Plan for proposed onsite habitats shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall be based on the proposals set out in the Ecological Impact Assessment (MBE/ECO/2023/18/01). The Management and Monitoring plan shall detail the following: - Objectives relating to the timescales in which it is expected progress towards meeting target habitat conditions will be achieved. - A commitment to adaptive management that allows a review of the management plan to be undertaken and changes implemented if agreed in writing by the LPA and if monitoring shows that progress towards target conditions is not progressing as set out in the agreed objectives. - That monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, and 5) immediately following habitat creation. Once approved in writing the management measures and monitoring plans shall be carried out as agreed.

    Reference
    U0118473