U0118432Bare brickwork
Brickwork adjoining the ground floor and upper floor corridors within the extension hereby granted shall remain exposed from finished floor level to ceiling level.
- Dataset
- Planning condition
- Reference
- U0118432
-
Typology type: Policy
U0118465Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0118465
-
Typology type: Policy
U0118466Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing Location Plan - Concept Plans and Elevations (23006-001 Rev A)
- Dataset
- Planning condition
- Reference
- U0118466
-
Typology type: Policy
U0118467Contamination CON2
Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to the LPA for approval. The associated works shall not re-commence until the reports have been submitted to and approved in writing by the LPA.
- Dataset
- Planning condition
- Reference
- U0118467
-
Typology type: Policy
U0118468Contamination CON3
Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and approved in writing by the LPA prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.
- Dataset
- Planning condition
- Reference
- U0118468
-
Typology type: Policy
U0118469Drainage Details (DA01)
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0118469
-
Typology type: Policy
U0118470Drainage (Watercourse Compliance)
No building shall be erected within 10 metres of the piped water course which passes through/runs adjacent to the site.
- Dataset
- Planning condition
- Reference
- U0118470
-
Typology type: Policy
U0118471Archaeology WSI
No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: - The programme and method of site investigation and recording. - The requirement to seek preservation in situ of identified features of importance. - The programme for post-investigation assessment. - The provision to be made for analysis and reporting. - The provision to be made for publication and dissemination of the results. - The provision to be made for deposition of the archive created. - Nomination of a competent person/persons or organisation to undertake the works. - The timetable for completion of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.
- Dataset
- Planning condition
- Reference
- U0118471
-
Typology type: Policy
U0118472External Materials
Prior to the commencement of the above ground works, details or samples of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall thereafter be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0118472
-
Typology type: Policy
U0118473Biodiversity Net Gain
Prior to the commencement of development, a Management and Monitoring Plan for proposed onsite habitats shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall be based on the proposals set out in the Ecological Impact Assessment (MBE/ECO/2023/18/01). The Management and Monitoring plan shall detail the following: - Objectives relating to the timescales in which it is expected progress towards meeting target habitat conditions will be achieved. - A commitment to adaptive management that allows a review of the management plan to be undertaken and changes implemented if agreed in writing by the LPA and if monitoring shows that progress towards target conditions is not progressing as set out in the agreed objectives. - That monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, and 5) immediately following habitat creation. Once approved in writing the management measures and monitoring plans shall be carried out as agreed.
- Dataset
- Planning condition
- Reference
- U0118473