U0118370No piped discharge
Unless otherwise agreed in writing with the District Planning Authority there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to the completion of the foul drainage works.
- Dataset
- Planning condition
- Reference
- U0118370
-
Typology type: Policy
U0118371Disabled access
The facilities as agreed to cater for disabled visitors, (including access to the building, movement within the building, car parking and the provision of sanitary conveniences) shall be retained and maintained at all times.
- Dataset
- Planning condition
- Reference
- U0118371
-
Typology type: Policy
U0118372Surfacing
Before the development is brought into use that part of the site to be used by vehicles shall be properly laid out, drained, surfaced, sealed and marked out in a manner to be approved by the District Planning Authority and shall thereafter be maintained in a condition to the reasonable satisfaction of the District Planning Authority.
- Dataset
- Planning condition
- Reference
- U0118372
-
Typology type: Policy
U0118373Heritage assets
The development hereby granted permission shall have regard to and respect, in terms of its design, height, overall scale and massing the historic built form which it adjoins and that against which it will be seen including listed buildings within the development site. In respect of the height of the development, the development shall respect the appearance of the tower of St. George's church and St. James' church spire and the Grand Theatre and the height of the development shall not detract from these elements or excessively dominate the skyline of this part of Doncaster. In respect of the design, scale and massing, the development shall have particular regard to the listed Grand Theatre and Railway Station.
- Dataset
- Planning condition
- Reference
- U0118373
-
Typology type: Policy
U0118374Public access
Pedestrian access between the interchange development, hereby granted permission, and Doncaster Town Centre, shall be available for use by all persons requiring such access except for the following times: North Mall/ Upper South Mall route: closed 15 minutes after Doncaster Interchange published transport times (bus and train) and re-opened 15 minutes before; South Mall route: closed 30 minutes after shop opening times and re-opened 30 minutes before. Such access shall not, at any other time, be closed or obstructed.
- Dataset
- Planning condition
- Reference
- U0118374
-
Typology type: Policy
U0118375Variation of opening hours
The Frenchgate Centre's opening hours will be kept under regular review and shall be varied within 28 days of any variation to Doncaster Interchange published transport times being made. Any variations to the opening or closing times of the North Mall/Upper South or South Mall routes shall be notified on site 28 days prior to implementation and in consultation with the Highway Authority.
- Dataset
- Planning condition
- Reference
- U0118375
-
Typology type: Policy
U0118376Signage
Within 1 month of the date of this decision, details of signage to direct pedestrians to the alternative routes between the interchange and Doncaster Town Centre (green and purple routes as shown on Proposed Ground Floor Plans, drawing no. 3885-03B) shall be submitted to the local planning authority for approval. The approved signage shall be installed within 4 weeks of that consent and retained for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0118376
-
Typology type: Policy
U0118377Intercom system
Outside of the Frenchgate Centre's opening hours, the measures as detailed at page 3 of the approved Design and Access Statement (Revision A, as received 10/11/2023) to provide access through the Frenchgate Centre to its carpark for interchange passengers shall be implemented in full and retained for the lifetime of the development. These shall include: - Onsite staff to open the rail doors to any commuters - Installation of an intercom at the rail doors for commuters directly to the Frenchgate Centre's control room.
- Dataset
- Planning condition
- Reference
- U0118377
-
Typology type: Policy
U0118380Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Site plan - Project no. 2053. Drawing no. BL101. Date 22/12/23. Date received: 28/12/2023 Proposed elevations - Project no. 2053. Drawing no. P102. Date 22/12/23. Date received: 28/12/2023 Proposed floor plans - Project no. 2053. Drawing no. P101. Date 22/12/23. Date received: 28/12/2023
- Dataset
- Planning condition
- Reference
- U0118380
-
Typology type: Policy
U0118396Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (received 21 December 2023)
- Dataset
- Planning condition
- Reference
- U0118396