Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0117884

    Cessation of all workings

    On the cessation of infilling and restoration operations, all buildings, plant, surface equipment, hard standing areas and internal haul roads shall be removed from the site within 12 months of the date of such cessation, unless otherwise agreed by the Mineral Planning Authority

    Reference
    U0117884
  • Typology type: Policy

    U0117886

    Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Dwg. No. 2021 ID 24 LOC 001 Revision A Site Location Plan received 16.10.23 Dwg. No. 2021 ID 24 WD001 Revision B General arrangement, elevations, section and site layout - Dwelling 1 received 16.10.23 Dwg. No. 2021 ID 24 WD003 Revision C General arrangements and elevations - Dwelling 2 received 16.10.23 Dwg. No. 2021 ID 24 WD007 Revision H External works received 12.01.24 Dwg. No. 2021 ID 24 WD008 Full extent of Access Road received 05.12.23 Dwg. No. 23016 DR C 0100 Drainage Strategy Revision P05 received 06.12.23 Headwall design H3C Close Coupled Grating 3 Sided Kee Klamp received 16.10.23

    Reference
    U0117886
  • Typology type: Policy

    U0117887

    Contamination

    The remediation of the site shall take place in accordance with the agreed details listed on drawing 2021-ID-24-WD007. The works shall set out the works required to render harmless the identified contamination given the proposed end-use of the site and demonstrate compliance with the proposed methodology and best practice guidance. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. Upon completion of the agreed remediation, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. The relevant areas subject to the remediation shall not come into use until such time as all verification data has been approved by the LPA.

    Reference
    U0117887
  • Typology type: Policy

    U0117888

    Ecological enhancement

    Within 3 months from the date of this permission, an ecological enhancement plan shall be submitted to the Local Planning Authority for approval in writing. This plan shall include details of the following measures, all of which shall be implemented in accordance with an agreed timescale to be approved in writing with the local planning authority: 2 bat boxes 2 bid boxes 2 trees shall be planted on the site to the satisfaction of the Local Planning Authority during the first available planting season. The plan shall include common/botanical names, nursery stock specification of trees and shrubs, planting density / numbers of plants for shrubs or hedges, seed mix and sowing densities for grass /wildflowers. Landscape management plan: on a ongoing managed basis, covering typically: weed control, top up mulch, pruning, mowing, watering, replacement of plant failures, litter collection, safety checks, removal of plant guards and shelters at appropriate stages. All aspects of the ecological enhancement plan shall be carried out in accordance with the agreed details within the first planting season following the occupation of any dwelling.

    Reference
    U0117888
  • Typology type: Policy

    U0117889

    Access layout

    The highway layout as shown on the approved plan (Dwg. No. 2021-ID-24-WD008 Full extent of access road) shall be drained, surfaced and where necessary marked out in accordance with the agreed details prior to the occupation of any dwelling.

    Reference
    U0117889
  • Typology type: Policy

    U0117890

    Bin store

    A bin store enclosure of no greater than 2m in height shall be affixed on the site in the position as shown on the approved plan (Dwg. No. 2021-ID-24-WD007G Masterplan External Works) prior to the occupation of any dwelling. The enclosure shall be maintained by the occupants of either property to ensure it provides a suitable means of enclosure for bins.

    Reference
    U0117890
  • Typology type: Policy

    U0117891

    Parking areas and boundary

    The off street parking areas and boundary treatments proposed for each dwelling as shown on the approved plans shall be provided prior to the occupation of that dwelling. The parking spaces shall be retained solely for that purpose for the lifetime of the development.

    Reference
    U0117891
  • Typology type: Policy

    U0117892

    Passing place

    The vehicle passing place as shown on the approved plans shall be provided prior to the occupation of more than one dwelling on the site. The passing place shall be retained solely for that purpose for the lifetime of the development.

    Reference
    U0117892
  • Typology type: Policy

    U0117893

    Drainage

    No dwellings or buildings shall be occupied until the drainage works as shown on the approved plan Dwg. No. 23016DR-C-0100 Drainage Strategy Revision P05 have been completed and are fully operational. The drainage system shall be maintained in accordance with the manufacturer's recommended guidance for the lifetime of the development.

    Reference
    U0117893
  • Typology type: Policy

    U0117894

    Drainage maintenance

    Prior to the first occupation of any dwelling hereby permitted, a maintenance plan detailing the maintenance arrangements including who is responsible for different elements of the drainage system and the maintenance activities/frequencies and annual monitoring, shall be submitted to and agreed, in writing, by the Local Planning Authority. Should any part be maintainable by a maintenance company, details of long-term funding arrangements should be provided. Subsequently, the development shall be carried out strictly in accordance with the approved maintenance arrangements with maintenance monitored annually.

    Reference
    U0117894