Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0117874

    Noise Complaint

    Noise arisings from the permitted site shall not exceed 55dB Laeq.1h (freefield) at noise measurement points at Doncaster Lane, Bannister Lane, Priory Farm and Home Farm as detailed in approved noise impact assessment. In the event of a noise complaint being received by the Waste Planning Authority regarding the development hereby permitted which, in the opinion of the Waste Planning Authority may be justified, at the first practicable opportunity following a request from the Waste Planning Authority a noise impact survey shall be carried out by the site owner or operator and submitted to the Waste Planning Authority for its written approval. The free field noise level associated with the development, when measured in the curtilage of the complainant's property (or any alternative location which may be agreed with the Waste Planning Authority) shall not exceed the background noise level by more than 10dB(A), subject to a maximum of 55dB LAeq 1hr. Should the survey demonstrate that those noise limits are being exceeded the report shall specify additional mitigation measures and details of their timing. Any additional mitigation measures that may be approved in writing by the Waste Planning Authority shall be carried out immediately upon approval and thereafter maintained.

    Reference
    U0117874
  • Typology type: Policy

    U0117875

    Implemented landscaping details

    The planting scheme shown on the approved plan Dwg No. WR7747_07_10 site restoration - landscape details hereby approved in writing by the Local Planning Authority, shall be implemented in the first available planting season after commencement of each restoration phase of the site/development in accordance with good horticultural practice and BS 8545:2014 Trees: from nursery to independence in the landscape - Recommendations. The local Planning Authority shall be notified in writing within 7 working days of completion of the landscape works to the required standard and the completion shall be subsequently approved in writing by the Local Planning Authority}. The approved scheme shall be maintained for a minimum of five years in accordance with BS 8545:2014 Trees: from nursery to independence in the landscape - Recommendations and good horticultural practice. Any landscape which is defective, damaged or removed within five years of establishment shall be replaced during the next available planting season in accordance with the approved details.

    Reference
    U0117875
  • Typology type: Policy

    U0117876

    Aftercare

    The application site shall undergo aftercare management for a 15 year period following completion of restoration. The date of commencement of the aftercare period shall be submitted to and approved in writing by the Waste Planning Authority before that period begins and the aftercare period shall run from the approved date.

    Reference
    U0117876
  • Typology type: Policy

    U0117877

    Ecological Enhancement Plan

    The development shall be carried out in full accordance with the Biodiversity Management and Monitoring Plan prepared by Futures Ecology (ref. FE71/BMMP01). The implementation of the plan shall be carried out as agreed.

    Reference
    U0117877
  • Typology type: Policy

    U0117878

    Intert waste disposal ceasing

    In the event of waste disposal operations ceasing for a period in excess of 12 months at any time before the full term hereby permitted, restoration of the application site shall commence in accordance with the approved landscaping scheme unless otherwise approved in writing by the Local Planning Authority and such restoration works shall be completed within 36 months of the date that they were commenced.

    Reference
    U0117878
  • Typology type: Policy

    U0117879

    Types of waste

    No waste shall be deposited at or imported into the site except those materials defined in the application, i.e. inert and non-hazardous construction, demolition and excavation material deemed suitable for disposal within an agreed environmental permit.

    Reference
    U0117879
  • Typology type: Policy

    U0117880

    Sole access

    The sole means of access onto the public highway shall be via the existing access arrangements into Skelbrooke Quarry, as indicated on the approved plan.

    Reference
    U0117880
  • Typology type: Policy

    U0117881

    Keep existing access

    The existing access and arrangements, including facilities to wash the wheels of vehicles, facilities to count the number of HGVs entering and leaving the site and the metalled surfacing of the access road shall be maintained for the duration of restoration works at the site for the duration of this permission.

    Reference
    U0117881
  • Typology type: Policy

    U0117882

    Bowser

    A water bowser or other method of dust suppression shall be used on the access road during dry weather conditions to minimise dust generation.

    Reference
    U0117882
  • Typology type: Policy

    U0117883

    Sub soil

    No subsoil resources shall be removed from the site, unless they are to be utilised in the restoration of the existing quarry.

    Reference
    U0117883