Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0117864

    Importation time limit

    The importation of permitted material (inert and non-hazardous construction, demolition and excavation material deemed suitable for disposal within an agreed environmental permit) into the site shall be completed no later than five years from the date of commencement of importation as notified to the Waste Planning Authority under condition 3. The Waste Planning Authority shall be notified in writing of the date of cessation of the importation of restoration material into the site within 14 days of its occurrence.

    Reference
    U0117864
  • Typology type: Policy

    U0117865

    Restoration time limit

    All restoration operations shall be completed no later than 2 years from the date of cessation of the importation of restoration material into the site as notified to the Waste Planning Authority under condition 3.

    Reference
    U0117865
  • Typology type: Policy

    U0117866

    Dust Management Plan

    The development shall be carried out in full accordance with the submitted Dust Management Plan for the lifetime of the development.

    Reference
    U0117866
  • Typology type: Policy

    U0117867

    HGV Management Scheme

    The development shall be carried out in full accordance with the submitted HGV Management Scheme for the lifetime of the development.

    Reference
    U0117867
  • Typology type: Policy

    U0117868

    Mud on highway

    No waste shall be deposited at the site until details of measures to prevent the deposit of mud on the public highway have been submitted to and approved in writing by the Waste Planning Authority. The approved measures shall be provided before any works are commenced on site. In the event that the access arrangements fail to prevent mud being carried on to the public highway, the operator shall submit for the written approval of the Mineral Planning Authority a scheme detailing measures to be taken to prevent the deposit of mud on to the public highway and thereafter implement and utilise the approved scheme for the duration of all operations on the site.

    Reference
    U0117868
  • Typology type: Policy

    U0117869

    Artificial lighting

    No floodlighting shall be erected on the site until details have been submitted to and approved in writing by the Waste Planning Authority. Floodlighting shall be angled downwards and suitably shielded to ensure that it does not result in glare or dazzle. Floodlighting shall not be used outside the following times: Mondays to Fridays 07:00 to 18:30 hours and Saturdays 07:00 to 13:30 hours. Outside those hours any external lighting shall only be operated individually and through a movement sensor switch with a maximum lighting cycle not exceeding 5 minutes.

    Reference
    U0117869
  • Typology type: Policy

    U0117870

    Operating hours

    Operations shall only take place during the following times: Mondays to Fridays 07:30 to 18:00 hours and; Saturdays 07:30 to 13:00 hours. The starting and warm up of plant and machinery is permitted from 07:00 on these days. No operations shall take place on Sundays or on Bank or Public Holidays.

    Reference
    U0117870
  • Typology type: Policy

    U0117871

    No crushing or screening

    No crushing or screening of waste shall take place on or adjacent to the site.

    Reference
    U0117871
  • Typology type: Policy

    U0117872

    Plant limit

    A maximum of three bulldozers 360o tracked excavator shall be operated on the site at any time. The mobile plant shall be fitted with white noise reversing warning devices and shall be fitted with silencers which shall be maintained in accordance with the manufacturer's recommendations and specifications.

    Reference
    U0117872
  • Typology type: Policy

    U0117873

    HGV movements

    There shall be no more than 300 HGV movements to and from the site (150 in, 150 out) in any one working day unless otherwise agreed with the LPA. Written records shall be maintained of all HGV movements into and out of the site and copies of those records shall be made available to the Waste Planning Authority within 7 days of a written request being made.

    Reference
    U0117873