U0117864Importation time limit
The importation of permitted material (inert and non-hazardous construction, demolition and excavation material deemed suitable for disposal within an agreed environmental permit) into the site shall be completed no later than five years from the date of commencement of importation as notified to the Waste Planning Authority under condition 3. The Waste Planning Authority shall be notified in writing of the date of cessation of the importation of restoration material into the site within 14 days of its occurrence.
- Dataset
- Planning condition
- Reference
- U0117864
-
Typology type: Policy
U0117865Restoration time limit
All restoration operations shall be completed no later than 2 years from the date of cessation of the importation of restoration material into the site as notified to the Waste Planning Authority under condition 3.
- Dataset
- Planning condition
- Reference
- U0117865
-
Typology type: Policy
U0117866Dust Management Plan
The development shall be carried out in full accordance with the submitted Dust Management Plan for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0117866
-
Typology type: Policy
U0117867HGV Management Scheme
The development shall be carried out in full accordance with the submitted HGV Management Scheme for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0117867
-
Typology type: Policy
U0117868Mud on highway
No waste shall be deposited at the site until details of measures to prevent the deposit of mud on the public highway have been submitted to and approved in writing by the Waste Planning Authority. The approved measures shall be provided before any works are commenced on site. In the event that the access arrangements fail to prevent mud being carried on to the public highway, the operator shall submit for the written approval of the Mineral Planning Authority a scheme detailing measures to be taken to prevent the deposit of mud on to the public highway and thereafter implement and utilise the approved scheme for the duration of all operations on the site.
- Dataset
- Planning condition
- Reference
- U0117868
-
Typology type: Policy
U0117869Artificial lighting
No floodlighting shall be erected on the site until details have been submitted to and approved in writing by the Waste Planning Authority. Floodlighting shall be angled downwards and suitably shielded to ensure that it does not result in glare or dazzle. Floodlighting shall not be used outside the following times: Mondays to Fridays 07:00 to 18:30 hours and Saturdays 07:00 to 13:30 hours. Outside those hours any external lighting shall only be operated individually and through a movement sensor switch with a maximum lighting cycle not exceeding 5 minutes.
- Dataset
- Planning condition
- Reference
- U0117869
-
Typology type: Policy
U0117870Operating hours
Operations shall only take place during the following times: Mondays to Fridays 07:30 to 18:00 hours and; Saturdays 07:30 to 13:00 hours. The starting and warm up of plant and machinery is permitted from 07:00 on these days. No operations shall take place on Sundays or on Bank or Public Holidays.
- Dataset
- Planning condition
- Reference
- U0117870
-
Typology type: Policy
U0117871No crushing or screening
No crushing or screening of waste shall take place on or adjacent to the site.
- Dataset
- Planning condition
- Reference
- U0117871
-
Typology type: Policy
U0117872Plant limit
A maximum of three bulldozers 360o tracked excavator shall be operated on the site at any time. The mobile plant shall be fitted with white noise reversing warning devices and shall be fitted with silencers which shall be maintained in accordance with the manufacturer's recommendations and specifications.
- Dataset
- Planning condition
- Reference
- U0117872
-
Typology type: Policy
U0117873HGV movements
There shall be no more than 300 HGV movements to and from the site (150 in, 150 out) in any one working day unless otherwise agreed with the LPA. Written records shall be maintained of all HGV movements into and out of the site and copies of those records shall be made available to the Waste Planning Authority within 7 days of a written request being made.