U0116457Construction Management
No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i. the site compound area and parking of vehicles of site operatives and visitors ii. loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v. wheel washing facilities vi. measures to control noise and the emission of dust and dirt during construction vii. scheme for recycling/disposing of waste resulting from demolition and construction works
- Dataset
- Planning condition
- Reference
- U0116457
-
Typology type: Policy
U0116458Waste Water Y.Water
The development shall be carried out in accordance with the details shown on the submitted, Flood Risk Assessment prepared by Clancy Consulting Ltd, dated 04/04/2023, unless otherwise agreed in writing with the Local Planning Authority.
- Dataset
- Planning condition
- Reference
- U0116458
-
Typology type: Policy
U0116459Tree Protection
The scheme of protection for all retained trees, including tree management, ground protection measures, the restoration of hard surfacing with the root protection areas of retained trees to soft landscaping and the erection of impact resistant protective barriers shall be implemented in full accordance with the plans and particulars contained within the approved Cheshire Woodlands Arboricultural Statement (ref. CW/10939-AS dated 31.10.2022 and the Tree Protection Plan ref. CW/10939-P-TPP dated 10.11.2022) before any equipment, machinery or materials have been brought on to site for the purposes of the development. The local planning authority shall be notified of implementation and shall visit site to approve the setting out of the site and location of protective barriers prior to the commencement of development. Thereafter tree protection practices shall be implemented and monitored in full accordance with the approved scheme until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made, without the written consent of the local planning authority.
- Dataset
- Planning condition
- Reference
- U0116459
-
Typology type: Policy
U0116460Noise 1
Prior to occupation of the development, a report detailing the design methodology to achieve the following internal acoustic standards shall be provided for approval to the LPA. All such requirements in the approved report shall be implemented prior to occupation of the development and a compliance report submitted to demonstrate that the requirements have been achieved (windows closed and alternative means of ventilation provided): - Average noise levels in living rooms and dining rooms during the day not to exceed 35 dB LAeq,0700-2300hrs and 40 dB LAeq,0700-2300hrs; - Average noise levels in bedrooms not to exceed 35 dB LAeq,0700-2300hrs and 30 dB LAeq,2300-0700hrs; - Maximum noise levels not to regularly exceed 45 dB LAmax in bedrooms during the 2300-0700hrs period.
- Dataset
- Planning condition
- Reference
- U0116460
-
Typology type: Policy
U0116461Acoustic Assessment
Prior to occupation of the development, a report detailing an acoustic assessment of the noise impact of all fixed plant and equipment on nearby residential uses in accordance with BS4142:2014 + A1:2019, shall be provided for approval to the LPA so as to demonstrate that the rating level of noise from all fixed plant and equipment does not exceed the measured background noise level at the nearby residential properties boundaries. All such requirements in the approved report shall be implemented prior to occupation of the development and a compliance report submitted to demonstrate that the requirements have been achieved.
- Dataset
- Planning condition
- Reference
- U0116461
-
Typology type: Policy
U0116462Lighting Assessment
Prior to occupation of the development, a report detailing a lighting impact assessment of external illumination on nearby residential uses in accordance with recognised ILP standards shall be provided for approval to the Local Planning Authority, so as to demonstrate that the impact of lighting from the site at the nearby residential properties boundaries does not cause adverse impact. All such requirements in the approved report shall be implemented prior to occupation of the development.
- Dataset
- Planning condition
- Reference
- U0116462
-
Typology type: Policy
U0116463Odours and Ventilation
Prior to commencement of the relevant works, details of an extraction/ventilation system to control the emission of cooking smells and fumes so as to prevent any odour disamenity to nearby residents shall be submitted to and approved by the local planning authority in writing, for the kitchen and any cafe. The approved scheme shall be installed and be fully operational when the use commences. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby residents.
- Dataset
- Planning condition
- Reference
- U0116463
-
Typology type: Policy
U0116464Travel Plan
Prior to the first occupation of the development hereby approved, an interim green travel plan for the development shall be submitted to and approved in writing by the Local Planning Authority. Following acceptance of the interim plan, the occupier shall submit their travel plan to the Local Planning Authority for approval and the approved plans shall thereafter be implemented within 3 months of first occupation of the development.
- Dataset
- Planning condition
- Reference
- U0116464
-
Typology type: Policy
U0116465Landscaping (hard and soft)
Prior to commencement any above ground works, a detailed all hard (including, bences, pegolas, bin stores, shelters, potting benches and raised beds) and soft landscape scheme shall be submitted to and approved in writing by the Local Planning Authority. The landscape scheme shall include details of all external hard and soft landscaping materials, including details or surfacing, structures and planting. The scheme shall be designed in accordance with chapter 14.7 of the 'Technical and Developer Requirements SPD' and include a management and maintenance plan for the scheme. The local planning authority notified in writing within 7 working days of the completion of the landscape works to inspect and approve practical completion in writing. The scheme thereby approved must be implemented prior to the occupation of the care facility. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0116465
-
Typology type: Policy
U0116466Drainage Management
Prior to the first occupation of the development hereby approved, details of the drainage management and maintenance plan shall be submitted to and approved in writing by the Local Planning Authority. The drainage system for foul and surface water drainage shall be retained, managed and maintained for the lifetime of the development in accordance with the approved drainage management and maintenance plan.
- Dataset
- Planning condition
- Reference