Search for planning and housing data
5,605 results
Dataset:
-
Typology type: Policy
U0116407Approved Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan. Date received: 18/08/2023. Site Plan. Drawing number: 23-010.A1.001. Revision 'D'. Date received. 28/11/2023. Existing and proposed plans. Drawing number: 23-010.A1.002. Revision 'A'. Date received: 28/11/2023
- Dataset
- Planning condition
- Reference
- U0116407
-
Typology type: Policy
U0116447In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan, drawing no. 23/012/07 - Existing and Proposed Floor Plans, drawing no. 23/012/08 - Completed Care Home Questionnaire (received 30/05/23) - Planning Statement (amended version received 04/09/2023)
- Dataset
- Planning condition
- Reference
- U0116447
-
Typology type: Policy
U0116448Approved Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan. Date received: 01/12/2023. Site Plan. Drawing number: A404. Revision 'B'. Date received: 24/11/2023. Proposed elevations. Drawing number: A102. Revision 'C'. Date received: 21/11/2023. Proposed Plans. Drawing number: A102. Revision 'C'. Date received: 21/11/2023.
- Dataset
- Planning condition
- Reference
- U0116448
-
Typology type: Policy
U0116450Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Title: Site Plan (Proposed Site Plan). Scale: 1:500. Title: Proposed Elevation Plans. Scale: 1:100. Date: 20/10/2023. DWG NO: 76HA_PrEL_10_23. Title: Proposed Floor Plans. Scale: 1:50. Date: 20/10/2023. DWG NO: 76HA_PrFP_10_23.
- Dataset
- Planning condition
- Reference
- U0116450
-
Typology type: Policy
U0116451Time
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0116451
-
Typology type: Policy
U0116452Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: o Proposed Site Location Plan (Ref 6429/00a Revision A) received 19.10.23 o Ground Floor Site Layout as Proposed (Ref 6429/22 Revision F) received 04.12.23 o First Floor Site Layout as Proposed (Ref 6429/23 Revision E) received 16.11.23 o Second Floor Site Layout as Proposed (Ref 6429/24 Revision E) received 16.11.23 o Roof Plan as Proposed (Ref 6429/25 Revision C) received 16.11.23 o Care Home Elevations as Proposed (Ref 6429/06 Revision B) received 12.12.23 o Boundary Treatment Plan (Ref 6429/13 Revision D) received 16.11.23 o Proposed Highway Works (Ref KMC22010/001 Revision C) received 19.10.23 o Overall Landscape Proposals (Ref SHD 100.23 SL-01 Revision D) received 19.10.23 o Planting Plan (Ref SHD 100.23 SL-02 Revision D) received 04.12.23 o Revised Landscape Proposals (SHD 100.23 SL-02D.) received 07.12.23
- Dataset
- Planning condition
- Reference
- U0116452
-
Typology type: Policy
U0116453Contaminated Land
No development approved by this permission shall be commenced prior to a contaminated land assessment and associated remedial strategy, together with a timetable of works, being accepted and approved by the Local Planning Authority (LPA), unless otherwise approved in writing with the LPA. o If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. o The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. o Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0116453
-
Typology type: Policy
U0116454Drainage
The development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0116454
-
Typology type: Policy
U0116455Materials
Prior to any above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0116455
-
Typology type: Policy
U0116456Ecology
On the commencement of development a Management and Monitoring Plan for proposed onsite habitats based on the proposals set out in the biodiversity net gain report (Estrada Ecology Ref: SQ-965.1 22/2/2023) shall be submitted to the Local Planning Authority for approval in writing. The Management and Monitoring plan shall detail the following: o Objectives relating to the timescales in which it is expected progress towards meeting target habitat conditions will be achieved. o A commitment to adaptive management that allows a review of the management plan to be undertaken and changes implemented if agreed in writing by the LPA and if monitoring shows that progress towards target conditions is not progressing as set out in the agreed objectives. o That monitoring reports shall be provided to the LPA on the 1st November of each year of monitoring (Years 1, 2, and 5) immediately following habitat creation. Once approved in writing the management measures and monitoring plans shall be carried out as agreed.
- Dataset
- Planning condition
- Reference
- U0116456