Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Typology type: Policy

    U0115071

    landscaping scheme

    Prior to commencement of construction, a landscaping scheme based on the submitted 'Landscaping Plan Rev A' received 02.11.2023 shall be submitted to and approved by the Local Planning Authority. This scheme shall also provide a detailed specification of the species, size, siting, planting distances, protection measures and programme of planting. Planting is to be carried out during the first available season after commencement of development and shall thereafter be maintained to the satisfaction of the Local Planning Authority and in accordance with the Local Planning Authority's document 'Landscape Specification in Relation to Development sites'. Any tree or shrub planted as part of the scheme which is removed or severely damaged or is found to be dying or seriously diseased within five years of planting shall be replaced within the next available planting season with a tree or shrub of a similar size and species to the satisfaction of the Local Planning Authority.

    Reference
    U0115071
  • Typology type: Policy

    U0115073

    Approved Plans

    The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan and Site Plan. Drawing number: 20-005-LP01. Date received: 18/05/2023. Proposed Site Plan. Drawing number: 23/005-P07. Revision 'E'. Date received: 16/10/2023. Proposed Ground Floor Plan. Drawing number: 23-005-DEMO1. Revision 'C'. Date received: 30/08/2023. Proposed First Floor. Drawing number: 23-005-P09. Revision 'B'. Date received: 23/07/2023. Proposed First Floor Demolition. Drawing number: 23-005-DEMO2. Revision 'B'. Date received: 23/07/2023. Proposed Second Floor. Drawing number: 23-005-P10. Revision 'B'. Date received: 23/07/2023. Proposed Second Floor Demolition. Drawing number: 23-005-DEMO3. Revision 'B'. Date received: 23/07/2023. Proposed Front and East Side Elevations. Drawing number: 23-005-P11. Revision 'A'. Date received: 25/07/2023. Proposed Rear and West Side Elevations. Drawing number: 23-005-P12. Revision 'B'. Date received: 16/10/2023

    Reference
    U0115073
  • Typology type: Policy

    U0115074

    RECORDING OF FORMER COACH HOUSE

    Prior to demolition of the former coach house a Level One Recording is required - in accordance with Historic England's Guide Understanding Historic Buildings: A guide to good Recording Practice and should be deposited with the local planning authority.

    Reference
    U0115074
  • Typology type: Policy

    U0115075

    THE MAIN ROOF

    Prior to the removal of the roof covering, a method statement shall be submitted that details the removal and storage of the tiles, details of the tile fixings along with photographic evidence and as samples available for inspection. This initial method statement should also explain how the building and internal fabric will be protected from the weather elements. Following the exposure of the roof frame, a condition report shall be submitted, setting out the method required for the work to be undertaken to the frame and the reinstatement of the roof covering. This should also include repairs to timbers, new sections of timber, any strengthening of existing timber and other associated matters to include insulation.

    Reference
    U0115075
  • Typology type: Policy

    U0115076

    GARAGE & CARPORT

    Details of materials and samples of brick and other finishes to be used in construction of the garage and car port, shall be submitted to and approved in writing by the Local Planning Authority.

    Reference
    U0115076
  • Typology type: Policy

    U0115077

    materials- roof

    The works to the main roof shall where possible utilise the existing roof tiles, where replacement tiles are required details of these including type, colour blend, and fixings shall be submitted to and approved in writing by the Local Planning Authority prior to their installation.

    Reference
    U0115077
  • Typology type: Policy

    U0115078

    External - main walls

    Prior to commencing work, agreement is required covering detailing as to how the re-used stone from the outbuilding will be keyed and fixed into the residue of remaining walls after the brick is removed and the type, mix and colour of mortar to be used. Random coursing is acceptable but an initial sample area of 2 sqm of stonework should be made available for inspection before continuing with the remainder of replacement.

    Reference
    U0115078
  • Typology type: Policy

    U0115079

    External windows and doors

    Prior to commencement of work a detailed report including plans on a window-by-window basis should be submitted for the approval of the local planning authority in respect of replacement and new windows. The report should also include details relating to the refurbishment and provision of new doors.

    Reference
    U0115079
  • Typology type: Policy

    U0115080

    Proposed steel supports

    Prior to commencement of works, the detailing and design of the glass extension, including structural steel supports to be approved by the Local Planning Authority. There is a need to minimise the impact of the new steelwork on the listed building.

    Reference
    U0115080
  • Typology type: Policy

    U0115081

    Internal - floors

    Prior to commencement of the relevant works, details of all floor fittings and finishes where altered or replaced shall be submitted to and approved in writing by the Local Planning Authority. Full details and justification of the replacement timber ground floor to solid floor construction shall be submitted to and approved in writing by the Local Planning Authority.

    Reference