U0114449PLANS
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan, Received: 3/4/2023 Proposed Floor Plans, Received: 3/4/2023
- Dataset
- Planning condition
- Reference
- U0114449
-
Typology type: Policy
U0114450EXTRACTION DETAILS -30DAYS FROM DECISION
Within 30 days of planning permission being granted, details of an extraction/ventilation system to control the emission of odours and fumes from the nail bar so as to prevent any odour disamenity to nearby residents shall be submitted to the local planning authority in writing, for approval. The approved scheme shall be installed and be fully operational within 30 days of approval. All equipment installed as part of the scheme shall thereafter be operated and maintained in accordance with the manufacturer's instructions. The system shall be so designed as to ensure that noise from its operation does not cause adverse impact to nearby residents.
- Dataset
- Planning condition
- Reference
- U0114450
-
Typology type: Policy
U0114451WASTE MAN DETAILS-14DAYS FROM DECISION
Within 14 days of planning permission being granted, a scheme for the management and storage of waste at the property shall be submitted to the local planning authority in writing, for approval. The approved scheme shall be fully implemented within 14 days of approval.
- Dataset
- Planning condition
- Reference
- U0114451
-
Typology type: Policy
U0114452Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0114452
-
Typology type: Policy
U0114453Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Existing Site and Location Plans (3990-01) - Proposals (3909-02A)
- Dataset
- Planning condition
- Reference
- U0114453
-
Typology type: Policy
U0114454Temporary Period - 10 Years
The development hereby permitted shall be for a limited period being the period of 10 years from the date of this decision. At the end of this period, the building shall be removed and the land restored in accordance with a scheme previously submitted to and approved in writing by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0114454
-
Typology type: Policy
U0114521Accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 25/08/2023 Site Plan: Drawing No. 1837/5 as received 30/08/2023 Proposed Plans: Drawing No. 1837/2 as received 30/08/2023
- Dataset
- Planning condition
- Reference
- U0114521
-
Typology type: Policy
U0114530Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 04/05/2023. Site Plan. Date received: 18/10/2023. Existing and proposed plans. Date received: 16/10/2023.
- Dataset
- Planning condition
- Reference
- U0114530
-
Typology type: Policy
U0114533amended
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Planning - Proposed Rev b -09.10.2023
- Dataset
- Planning condition
- Reference
- U0114533
-
Typology type: Policy
U0114534FRA
The development shall be carried out in accordance with the submitted flood risk assessment (ref 15th July 2023 / MAW Town Planning Ltd) and site plan ( and the following mitigation measures it details: o The sales office will be of flood resilient design and construction o The site fencing will be of open design to allow the free movement of flood water across the site These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.