Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0113999Internal alterations
Prior to commencement of relevant works details of the internal alterations to classrooms S5 and S6 shall be submitted to and approved in writing by the Local Planning Authority. These shall include details of the removal and infilling of doorway 01 within classroom S5 and statement/details of what will happen to the original door. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0113999
-
Policy
U0114000Original doors
Unless otherwise shown all other original doors should be retained in-situ and not replaced.
- Dataset
- Planning condition
- Reference
- U0114000
-
Policy
U0114001Windows
Prior to commencement of relevant works full details of the replacement windows to classrooms S5 and S6, and the adjoining greenhouse shall be submitted to and approved in writing by the Local Planning Authority. Details shall include their design, construction and finish. Unless otherwise agreed in writing, the details shall include an elevation at 1:20 scale of the window type and 1:5 scale cross-sections. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0114001
-
Policy
U0114002Cowls
Prior to removal of existing cowls details of their making good shall be submitted for the and approved in writing by the Local Planning Authority. Details shall include samples of any replacement roof tiles. Development shall be carried out in accordance with the approved details.
- Dataset
- Planning condition
- Reference
- U0114002
-
Policy
U0114003Time
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0114003
-
Policy
U0114004Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan Reference TQRQM23107105618463 received 18.04.23 Site Plan received 25.09.23 Foundation and Structural GF Plan received 19.04.23 Wet room plans received 19.04.23 First floor setting out plans received 19.04.23 Elevations 1 of 2 received 19.04.23 Elevations 2 of 2 received 19.04.23 Proposed tender plans received 18.04.23
- Dataset
- Planning condition
- Reference
- U0114004
-
Policy
U0114005Materials
Prior to any above ground works details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0114005
-
Policy
U0114006CTMP
No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i. the site compound and parking of vehicles for site operatives and visitors ii. the areas for loading and unloading of plant and materials iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate v. wheel washing facilities vi. measures to control noise and the emission of dust and dirt during construction vii. a scheme for recycling/disposing of waste resulting from demolition and construction works
- Dataset
- Planning condition
- Reference
- U0114006
-
Policy
U0114007FRA
The development shall be carried out in accordance with the submitted flood risk assessment (ref AEG02570_DN5_Bentley_07 / aegaea / 30/06/2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 5.83 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0114007
-
Policy
U0114008Obscure Glazing
Prior to the first occupation or use of the building for its approved use, obscured glazing panels to a minimum of level 3 on the Pilkington scale shall be fitted to the windows in the east elevation of the proposed building. The approved panels shall not thereafter be replaced other than with glazing of an equivalent or greater degree of obscurity.
- Dataset
- Planning condition
- Reference
- U0114008