Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Policy

    U0113757

    Vehicle Turning Space

    The vehicle turning space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such.

    Reference
    U0113757
  • Policy

    U0113758

    Parking Areas

    Before the development hereby permitted is brought into use, the parking as shown on the approved plans shall be provided. The parking area shall not be used otherwise than for the parking of private motor vehicles belonging to the occupants of and visitors to the development hereby approved.

    Reference
    U0113758
  • Policy

    U0113759

    Visiblity Lines

    Before the development is brought into use, the sight lines as shown on the approved plan shall be rendered effective by removing or reducing the height of anything existing on the land hatched black on the said plan which obstructs visibility at any height greater than 900mm above the level of the near side channel line of the public highway. The visibility thus provided shall thereafter be maintained as such, unless otherwise approved in writing with the local planning authority.

    Reference
    U0113759
  • Policy

    U0113760

    Drainage

    The development hereby granted shall be undertaken in accordance with the below referenced plans and reports: - Drainage Strategy (DR-C-0100 Rev P6) (submitted 24 August 2023) - Surface Water Drainage Maintenance and Management Schedule - Drainage Calculations (submitted 24 August 2023) The approved drainage scheme shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.

    Reference
    U0113760
  • Policy

    U0113761

    Contamination Verification (Part d)

    Prior to the occupation of the site, a Phase 4 verification report shall be submitted to and approved in writing by the Local Planning Authority (LPA). The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.

    Reference
    U0113761
  • Policy

    U0113762

    Restriction of PD

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no additions, extensions or other alterations other than that expressly authorised by this permission shall be carried out without prior permission of the local planning authority.

    Reference
    U0113762
  • Policy

    U0113763

    Landscaping Plan

    The Landscaping Plan (006 Rev C - received 12 July 2023) shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.

    Reference
    U0113763
  • Policy

    U0113764

    External Materials

    The development shall be carried out in accordance with the approved materials: - Red Ecostock brick - Anthracite concrete roof tiles

    Reference
    U0113764
  • Policy

    U0113765

    Refuse Storage

    The approved scheme for the storage of refuse and recycling shall be carried out in accordance with Refuse Plan (007) (received 13 June 2023). The scheme shall be carried out in full as approved prior to first occupation of the development and the refuse and recycling storage facilities shall thereafter be retained for use at all times.

    Reference
    U0113765
  • Policy

    U0113789

    Approved Plans

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (10 August 2023) - Low Skillion Roof Shed 6'w x 4'd - Elevation View and Plan View

    Reference
    U0113789