Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0113568FRA Compliance
The development shall be carried out in accordance with the submitted flood risk assessment by Alan Wood and Partners referenced JAG/AD/JR/49495-Rp001 and dated 2 August 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.66 meters Above Ordnance Datum (mAOD) as set detailed within section 7.2.5 of the FRA. - The shed shall be of an open construction and have an open-door policy to allow flood waters to pass though unheeded as set out in paragraphs 7.3.1 - 7.3.3 of the FRA. - Electrical or other flood sensitive equipment shall be elevated to 4.40 mAOD or above as detailed in paragraph 7.3.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0113568
-
Policy
U0113607In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans (Includes Elevations, Site and Location Plan): Drawing No. 0423-45MS-002 (Revision A) as received 19/09/2023 Proposed Floor Plans: Drawing No. 0423-45MS-003 as received 19/06/2023
- Dataset
- Planning condition
- Reference
- U0113607
-
Policy
U0113608Matching materials
Unless specified otherwise on the approved plans, the external materials and finishes shall match the existing property.
- Dataset
- Planning condition
- Reference
- U0113608
-
Policy
U0113617Standard of work
Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.
- Dataset
- Planning condition
- Reference
- U0113617
-
Policy
U0113674Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Machinery Store, Proposed Location Plan, July 2023 Machinery Store, Proposed Site Plan, Sep 2023 Rev B received 28.09.2023 Proposed New Hay Storage Shed CFB/23/HT/01
- Dataset
- Planning condition
- Reference
- U0113674
-
Policy
U0113675Not brought into use
The building hereby approved must not to be brought into use until the access as shown on the approved drawings connecting Sheep Lane to the Farmyard is complete and available for the use of vehicular traffic.
- Dataset
- Planning condition
- Reference
- U0113675
-
Policy
U0113699Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Location Plan. Date received: 09/08/2023 Site Plan (proposed). Date recieved: 09:08/2023 Existing and proposed floor plans and elevations. Date recieved: 09/08/2023
- Dataset
- Planning condition
- Reference
- U0113699
-
Policy
U0113701Approved Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Location Plan and Block Plan. Drawing number: BL101. Revision '1'. Date received: 15/09/2023. Proposed elevations. Drawing number: P102. Date received:14/08/2023. Proposed floor plans. Drawing number: P101. Date received: 14/08/2023.
- Dataset
- Planning condition
- Reference
- U0113701
-
Policy
U0113702demolish garage
Prior to the occupation of the extension hereby approved, part of the existing garage shall be demolished as indicated on the proposed block plan (drawing no BL101 Rev 1).
- Dataset
- Planning condition
- Reference
- U0113702
-
Policy
U0113703Accordance with Plans Specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received11/08/2023 Site Plan: as received 11/08/2023 Existing and Proposed Plans: as received 11/08/2023
- Dataset
- Planning condition
- Reference
- U0113703