Skip to main content

This is a new service - your feedback will help us to improve it.

Search for planning and housing data

Warning The data may be incomplete and not yet cover all of England. We're working to improve its availability and quality.

Filters

Typology

Typology

Dataset

1 selected
Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?
For example, 27 3 2021
Do you want to see entries since the date or after the date?
Clear

5,605 results

  • Policy

    U0113255

    External ramp and steps

    Prior to relevant works full details of the ramp and steps to the exterior of the south entrance doorway shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how any disturbance to the historic fabric will be minimised, with details of the railing and stonework to the ramp and step. Sample of the stone to be provided on site. Works to be carried out in accordance with agreed details.

    Reference
    U0113255
  • Policy

    U0113256

    South entrance door

    Prior to relevant works full details of the alterations to the south entrance door shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the existing door will be altered to allow glazing to be installed to the upper panels but retain the curved moulding to the top and how the doors will be modified to swing outwards rather than inwards as currently. Works to be carried out in accordance with agreed details.

    Reference
    U0113256
  • Policy

    U0113257

    CTMP

    No development shall take place, including any works of demolition, until a Construction Traffic Management Plan has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: i. the site compound and parking of vehicles for site operatives and visitors ii. areas for loading and unloading of plant and materials with daily numbers and anticipated hours of delivery (avoid school pick up/drop off and peak traffic times) iii. storage of plant and materials used in constructing the development iv. the erection and maintenance of security hoarding close to the adopted highway v. wheel washing facilities if hard standing areas not utilised. vi. measures to control noise and the emission of dust and dirt during construction

    Reference
    U0113257
  • Policy

    U0113258

    plans list

    The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed plans and sections (CCD:04/2201 Rev A) dated APR 23 received 24.7.23 Proposed elevations and roof plan (CCD:04/2202 Rev A) dated APR 23 received 24.7.23

    Reference
    U0113258
  • Policy

    U0113259

    materials

    Prior to the commencement of the relevant works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.

    Reference
    U0113259
  • Policy

    U0113260

    LBC arch

    Part A (pre-commencement) No development, including any demolition and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: o The programme and method of site investigation and recording. o The requirement to seek preservation in situ of identified features of importance. o The programme for post-investigation assessment. o The provision to be made for analysis and reporting. o The provision to be made for publication and dissemination of the results. o The provision to be made for deposition of the archive created. o Nomination of a competent person/persons or organisation to undertake the works. o The timetable for completion of all site investigation and post-investigation works. Part B (pre-occupation/use) Thereafter the development shall only take place in accordance with the approved WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed.

    Reference
    U0113260
  • Policy

    U0113261

    Alterations to the existing fire escape

    Prior to relevant works full details of the alterations to the current fire escape from the basement area shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the impact on any historic fabric will be minimised, details of the railings to be installed around the building and the new door. Repairs to render shall match existing in finish/texture and all to be coloured to match the adjoining stonework unless otherwise agreed in writing by the Local Planning Authority. Works to be carried out in accordance with agreed details.

    Reference
    U0113261
  • Policy

    U0113262

    External ramp and steps

    Prior to relevant works full details of the ramp and steps to the exterior of the south entrance doorway shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how any disturbance to the historic fabric will be minimised, with details of the railing and stonework to the ramp and step. Sample of the stone to be provided on site. Works to be carried out in accordance with agreed details.

    Reference
    U0113262
  • Policy

    U0113263

    South entrance door

    Prior to relevant works full details of the alterations to the south entrance door shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the existing door will be altered to allow glazing to be installed to the upper panels but retain the curved moulding to the top and how the doors will be modified to swing outwards rather than inwards as currently. Works to be carried out in accordance with agreed details.

    Reference
    U0113263
  • Policy

    U0113264

    solar panels

    Prior to relevant works full details of the installation of the solar panel shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the solar panels will be fixed to the roof and how wires will be run so that in both matters any impact on historic fabric will be minimised. Works to be carried out in accordance with agreed details.

    Reference
    U0113264