Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0113228Drainage details (amended)
The Drainage System as approved under reference 23/00523/COND shall be implemented in accordance with approved drawings listed below: - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46 Works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0113228
-
Policy
U0113229Surface water via interceptor (amended)
All surface water run off from the site, excepting roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46
- Dataset
- Planning condition
- Reference
- U0113229
-
Policy
U0113230Vehicle wash run off (amended)
Any water run off from the vehicle wash down area shall be discharged to the public foul sewer (in accordance with PPG13-Vehicle washing and cleaning) via a suitable oil/ petrol/grit interceptor. These arrangements shall be implemented according to details listed below and as approved by the Local Planning Authority under reference 23/00523/COND and they shall be fully operational before the site is brought into use. - Drainage Plan, 13664-077-33-A - Surface Water Strategy Report (Marks Heeley Ltd, ref. H16601), April 2023 - Finishes Plan, 13664-077-46
- Dataset
- Planning condition
- Reference
- U0113230
-
Policy
U0113231CTMP (amended)
The Construction Traffic Management Plan as approved under reference 23/00392/COND (Bellamy Roberts, DE/MT/5859/CTMP.1 February 2023). The development shall be carried out in accordance with the agreed details.
- Dataset
- Planning condition
- Reference
- U0113231
-
Policy
U0113232Facilitation tree works
Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.
- Dataset
- Planning condition
- Reference
- U0113232
-
Policy
U0113233Piped discharge
There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works , details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed , the information shall include , but not be exclusive to:- a) evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical; b) evidence of existing positive drainage to public sewer and the current points of connection; and c) the means of restricting the discharge to public sewer to the existing rate less a minimum 30% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.
- Dataset
- Planning condition
- Reference
- U0113233
-
Policy
U0113251stat
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0113251
-
Policy
U0113252plans list
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed plans and sections (CCD:04/2201 Rev A) dated APR 23 received 24.7.23 Proposed elevations and roof plan (CCD:04/2202 Rev A) dated APR 23 receievd 24.7.23
- Dataset
- Planning condition
- Reference
- U0113252
-
Policy
U0113253materials
Prior to the commencement of the relevant works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0113253
-
Policy
U0113254Alterations to the existing fire escape
Prior to relevant works full details of the alterations to the current fire escape from the basement area shall be submitted to and agreed in writing by the Local Planning Authority. Details shall include how the impact on any historic fabric will be minimised, details of the railings to be installed around the building and the new door. Repairs to render shall match existing in finish/texture and all to be coloured to match the adjoining stonework unless otherwise agreed in writing by the Local Planning Authority. Works to be carried out in accordance with agreed details.
- Dataset
- Planning condition
- Reference
- U0113254