Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0113025Tree Protection Measures
Prior to the commencement of the development hereby granted a scheme for the protection of the root protection areas of all trees shown for retention on the approved plan that complies with clause 6.2 of British Standard 5837: 2012 Trees in Relation to Design, Demolition and Construction - Recommendations shall be submitted to and approved in writing by the Local Planning Authority. Tree protection measures shall be implemented on site in accordance with the approved details and the local planning authority notified of implementation to approve the setting out of the tree protection scheme before any equipment, machinery or materials have been brought on to site for the purposes of the development. Thereafter, all tree protection shall be maintained in full accordance with the approved details until all equipment, machinery and surplus materials have been removed from the site, unless the local planning authority gives its written approval to any variation. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made.
- Dataset
- Planning condition
- Reference
- U0113025
-
Policy
U0113118In accordance with specified plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan - Site Plan - Existing and Proposed Ground Floor Layout - Proposed first floor layout (amended version received 12/09/2023) - Proposed second floor layout (amended version received 12/09/2023) - Design and Access Statement
- Dataset
- Planning condition
- Reference
- U0113118
-
Policy
U0113157Standard of work
Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.
- Dataset
- Planning condition
- Reference
- U0113157
-
Policy
U0113158Accordance with Plans Specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Location Plan: as received 17/07/2023 Proposed Plans: 43KC001 Sheets 1 to 4, Revision 02 as received 17/07/2023
- Dataset
- Planning condition
- Reference
- U0113158
-
Policy
U0113163Time
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0113163
-
Policy
U0113164Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Floor Plans as Proposed - Ref 22104 Revision C Landscaping Plan - Ref 22104 Revision A Site Plan - Ref 22104 Revision A Elevations as Proposed Ref 22104 Revision A
- Dataset
- Planning condition
- Reference
- U0113164
-
Policy
U0113165Materials
Prior to any above ground works, details of the proposed external materials shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved materials.
- Dataset
- Planning condition
- Reference
- U0113165
-
Policy
U0113166Drainage
The development hereby granted shall not be begun until details of the foul and surface water systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating to the satisfaction of the Local Planning Authority prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0113166
-
Policy
U0113167Landscaping
No development shall take place on the site until a detailed hard and soft landscape scheme based on the approved landscape masterplan (drawing 22104/007/B) has been submitted to and approved in writing by the Local Planning Authority. The hard landscape scheme shall include details of all external hard surfacing materials, including adoptable highway finishes and footpaths through POS. The soft landscape scheme shall include a soft landscape plan; a schedule providing plant and tree numbers and details of the species, which shall comply with the Council's Transitional Developer Requirements Document, nursery stock specification in accordance with British Standard 3936: 1992 Nursery Stock Part One and planting distances of trees and shrubs; a specification of planting and staking/guying; a timescale of implementation; a detailed specification for tree pit construction for the trees within highway that utilises a professionally recognised method of construction to provide the minimum rooting volume set out in the Council's guidance and a load-bearing capacity equivalent to BS EN 124 2015 Class C250 for any paved surface above; a specification for planting including details of tree support, tree pit surfacing, aeration and irrigation and details of management and maintenance for a minimum of 5 years following practical completion of the landscape works. Thereafter the landscape scheme shall be implemented in full accordance with the approved details and the Local Planning Authority shall be notified in writing within 7 working days to approve practical completion of any planting within public areas or adoptable highway within the site. Soft landscaping for any individual housing plot must be implemented in full accordance with the approved scheme, prior to occupation of the home, which will be monitored by the Local Planning Authority. Any part of the scheme which fails to achieve independence in the landscape, or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation.
- Dataset
- Planning condition
- Reference
- U0113167
-
Policy
U0113168Landscape Management
Following the commencement of the development and before 30th September of every year during the implementation period (either phased or in full) and 5 year aftercare period, a 'Landscaping Implementation Report' shall be prepared by a suitably qualified landscape architect and / or contractor, and submitted by the developer to the Local Planning Authority in order to demonstrate that the landscaping has been carried out in full accordance with the approved landscaping details. The report should record the landscaping operations carried out on the land since the date of commencement, or previous report / aftercare meeting, and set out the intended operations for the next 12 months. It shall cover the following matters in particular, but not limited to, species, size, location, planting and aftercare specification, and be illustrated with evidence such as an overall progress summary, inspection site visit notes, a schedule of maintenance operations undertaken, before and after photos of any remedial plantings or completed works. If required, the developer shall arrange to attend a site meeting with the Local Planning Authority to inspect the planting and ongoing maintenance requirements.
- Dataset
- Planning condition
- Reference
- U0113168