U0112756Approved plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: 2023/047/13 Proposed Site Plan 2023/047/14 Proposed Elevations
- Dataset
- Planning condition
- Reference
- U0112756
-
Policy
U0112760Time
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0112760
-
Policy
U0112761Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Location Plan (Reference 2023/039/03) - Proposed Plan (Reference 2023/039/02A April 2023)
- Dataset
- Planning condition
- Reference
- U0112761
-
Policy
U0112762FRA
The development permitted by this planning permission shall be carried out in accordance with the approved flood risk assessment (FRA) produced by J Roberts Design Ltd Structural and Engineering Consultants (Reference 3225 Rev A / Aug 2023) and the following mitigation measures detailed within the FRA: - The site is signed up for flood warnings with the EA flood warning scheme. The mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may subsequently be agreed, in writing, by the local planning authority.
- Dataset
- Planning condition
- Reference
- U0112762
-
Policy
U0112763Flood Evac Plan
Before the first occupation of the development hereby approved a Flood Evacuation Plan shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0112763
-
Policy
U0112768PLANS
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Site Plan, Drawing No: 100094.03, Rev: B, Received: 24/8/2023 Proposed Plans, Drawing No: 100094.05, Rev: C, Received: 24/8/2023
- Dataset
- Planning condition
- Reference
- U0112768
-
Policy
U0112801Standard of work
Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.
- Dataset
- Planning condition
- Reference
- U0112801
-
Policy
U0112802Standard of work
Tree surgery work shall be carried out in full accordance with the scheme hereby approved and in compliance with clause 7: Pruning and related work of British Standard 3998: 2010 Tree Work - Recommendations.
- Dataset
- Planning condition
- Reference
- U0112802
-
Policy
U0112814Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0112814
-
Policy
U0112815Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Proposed Plans (BaM_MA_DET_R21 - 901) - Proposed Elevation - Village (BaM_MA_DET_R21 - 911) - Location Plan (RWC_A01_04 Rev C) - Planning Layout (RWC_A01_06_01 Rev A) - Planning Layout (RWC_A01_01 Rev C)