U0112212Permitted Development Rights Restriction
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 2 (or any subsequent order or statutory provision revoking or re-enacting that order) no additional walls, fences or other means of enclosure (other than those shown on approved plan 01 R8) shall be erected on land between the walls of any dwellings fronting a highway and the highway boundary without the prior permission of the local planning authority.
- Dataset
- Planning condition
- Reference
- U0112212
-
Policy
U0112213Construction Hours
Demolition or construction works shall not take place outside the following hours: 08:00 to 1800 hours Mondays to Fridays 08:00 to 13:00 on Saturdays Demolition or construction works shall not take place at any time on Sundays or Bank Holidays.
- Dataset
- Planning condition
- Reference
- U0112213
-
Policy
U0112214Contamination CON1
No development shall commence until a contaminated land assessment and associated remedial strategy, together with a timetable of works, has been submitted to and approved by the Local Planning Authority (LPA. a) The Phase I desktop study, site walkover and initial assessment must be submitted to the LPA for approval. Potential risks to human health, property (existing or proposed) including buildings, livestock, pets, crops, woodland, service lines and pipes, adjoining ground, groundwater, surface water, ecological systems, archaeological sites and ancient monuments must be considered. The Phase 1 shall include a full site history, details of a site walkover and initial risk assessment. The Phase 1 shall propose further Phase 2 site investigation and risk assessment works, if appropriate, based on the relevant information discovered during the initial Phase 1 assessment. b) The Phase 2 site investigation and risk assessment, if appropriate, must be approved by the LPA prior to investigations commencing on site. The Phase 2 investigation shall include relevant soil, soil gas, surface and groundwater sampling and shall be carried out by a suitably qualified and accredited consultant/contractor in accordance with a quality assured sampling and analysis methodology and current best practice. All the investigative works and sampling on site, together with the results of analysis, and risk assessment to any receptors shall be submitted to the LPA for approval. c) If as a consequence of the Phase 2 Site investigation a Phase 3 remediation report is required, then this shall be approved by the LPA prior to any remediation commencing on site. The works shall be of such a nature as to render harmless the identified contamination given the proposed end-use of the site and surrounding environment including any controlled waters, the site must not qualify as contaminated land under Part 2A of the Environment Protection Act 1990 in relation to the intended use of the land after remediation. d) The approved Phase 3 remediation works shall be carried out in full on site under a quality assurance scheme to demonstrate compliance with the proposed methodology and best practice guidance. The LPA must be given two weeks written notification of commencement of the remediation scheme works. If during the works, contamination is encountered which has not previously been identified, then all associated works shall cease until the additional contamination is fully assessed and an appropriate remediation scheme approved by the LPA. e) Upon completion of the Phase 3 works, a Phase 4 verification report shall be submitted to and approved by the LPA. The verification report shall include details of the remediation works and quality assurance certificates to show that the works have been carried out in full accordance with the approved methodology. Details of any post-remedial sampling and analysis to show the site has reached the required clean-up criteria shall be included in the verification report together with the necessary documentation detailing what waste materials have been removed from the site. The site shall not be brought into use until such time as all verification data has been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0112214
-
Policy
U0112215Contamination CON3
Any soil or soil forming materials brought to site for use in garden areas, soft landscaping, filing and level raising shall be tested for contamination and suitability for use on site. Proposals for contamination testing including testing schedules, sampling frequencies and allowable contaminant concentrations (as determined by appropriate risk assessment) and source material information shall be submitted to and be approved in writing by the Local Planning Authority (LPA) prior to any soil or soil forming materials being brought onto site. The approved contamination testing shall then be carried out and verification evidence submitted to and approved in writing by the LPA prior to any soil and soil forming material being brought on to site.
- Dataset
- Planning condition
- Reference
- U0112215
-
Policy
U0112216Landscaping
The landscaping indicated on the Landscape Masterplan and Planting Plan (140-004 Rev F - received 08 August 2023) shall be implemented in full accordance with the approved details and the Local Planning Authority notified in writing within 7 working days to approve practical completion. Any part of the scheme which fails to achieve independence in the landscape or is damaged or removed within five years of planting shall be replaced during the next available planting season in full accordance with the approved scheme, unless the local planning authority gives its written approval to any variation. The new boundary wall adajcent to plot 1 shall be no higher than 900mm.
- Dataset
- Planning condition
- Reference
- U0112216
-
Policy
U0112217Tree Protective Fencing
No above ground works shall commence until the trees which it has been agreed shall be retained are fenced off in accordance with the Tree Protection Plan (004 Rev D). The works shall thereafter be carried out in accordance with the plan.
- Dataset
- Planning condition
- Reference
- U0112217
-
Policy
U0112221Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0112221
-
Policy
U0112222Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site and Location Plans (3943-02B) - Existing and Proposed (3943-01D)
- Dataset
- Planning condition
- Reference
- U0112222
-
Policy
U0112223Contamination CON2
Should any unexpected significant contamination be encountered during development, all associated works shall cease and the Local Planning Authority (LPA) shall be notified in writing immediately. A Phase 3 remediation and Phase 4 verification report shall be submitted to and approved in writing by the LPA. The associated works shall not re-commence until the reports have been approved by the LPA.
- Dataset
- Planning condition
- Reference
- U0112223
-
Policy
U0112224Tree Protection
The proposed development shall be carried out in accordance with approved plan 'Tree Protection' (3943-03B) until all equipment, machinery and surplus materials have been removed from the site. Nothing shall be stored or placed in any area fenced in accordance with this condition and the ground levels within those areas shall not be altered, nor shall any excavation be made.
- Dataset
- Planning condition
- Reference
- U0112224