Search for planning and housing data
5,605 results
Dataset:
-
Policy
U0112174Windows
The 2 new eaves level windows to the first-floor extension shall be timber sliding sash windows to match in design the existing windows on the ground floor and on the east elevation. Any new heads and cills shall also match the existing heads and cills on these elevations.
- Dataset
- Planning condition
- Reference
- U0112174
-
Policy
U0112175Gable Verges
The gable verge of the first-floor extension and those of the eaves level gabled dormers shall be mortared verges in keeping with the existing building and not dry upvc plastic verge caps.
- Dataset
- Planning condition
- Reference
- U0112175
-
Policy
U0112194Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Existing plans (elevations and floor plans). Date received: 05/07/2023. Proposed plans (elevations and floor plans) including both site and location plans. Date received: 05/07/2023.
- Dataset
- Planning condition
- Reference
- U0112194
-
Policy
U0112205Implementation
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
- Dataset
- Planning condition
- Reference
- U0112205
-
Policy
U0112206Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: - Site Plan (001 Rev C) (received 04 July 2023) - Plot 1 - 3 Bed bungalow (003) - Plot 2 General Arrangement (002)
- Dataset
- Planning condition
- Reference
- U0112206
-
Policy
U0112207Surface and Foul Drainage Scheme (DA01)
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.
- Dataset
- Planning condition
- Reference
- U0112207
-
Policy
U0112208Ecological Enhancement Plan
Prior to the first occupation of the site, an ecological enhancement plan shall be implemented including the following measures: - One integrated bat box of the Vivaro Pro, build-in. Bat Tube (or similar) or an 'Improved Crevice Bat Box' (or similar) be installed within each of the proposed dwellings on plots 1 and 2. The bat boxes shall thereafter be retained.
- Dataset
- Planning condition
- Reference
- U0112208
-
Policy
U0112209Vehicle Turning and Parking Space(HIGH3)
The vehicle turning and parking space as shown on the approved plans shall be constructed before the development is brought into use and shall thereafter be maintained as such.
- Dataset
- Planning condition
- Reference
- U0112209
-
Policy
U0112210External Materials
Prior to the commencement of the relevant site works, details or samples of the external materials including any brickwork and roof tiles to be used in the construction of the external surfaces of the dwelling hereby approved shall be submitted to and approved in writing by the local planning authority. The details shall include the materials for the proposed boundary wall adjacent to plot 1.
- Dataset
- Planning condition
- Reference
- U0112210
-
Policy
U0112211Permitted Development Rights Restriction
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (No.596) (England) Order 2015, Article 3, Schedule 2: Part 1 (or any subsequent order or statutory provision revoking or re-enacting that order) no additions, extensions or other alterations other than that expressly authorised by this permission shall be carried out without prior permission of the local planning authority. This includes the insertion of additional windows.
- Dataset
- Planning condition
- Reference
- U0112211