U0112129Yorkshire Water CEMP
No works shall commence above ground prior to the completion of a Construction Environmental Management Plan (CEMP) study to understand the impact of planning permission on the principal aquifer. Furthermore, the findings and recommendations of the approved CEMP must be implemented.
- Dataset
- Planning condition
- Reference
- U0112129
-
Policy
U0112150Amended Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed Site Plan 220041-WDK-030SI-DR-A-04003 REV P05 - amended 15/03/2023 Typical Site Layout - 220041 WDK 03 SI DR A 04006 REV P03 - Amended 15/03/2023 Proposed Plans (double unit) 220041-WDK-ZZ-ZZ-DR-A-04004 REV P04 - received 11/01/2023 Proposed Plans (single unit) 220041-WDK-ZZ-ZZ-DR-A-04005 REV P04 - received 11/01/2023
- Dataset
- Planning condition
- Reference
- U0112150
-
Policy
U0112151EA FRA
The development shall be carried out in accordance with the submitted Addendum to the FRA (prepared by Waldeck Consulting, reference 220041-WDK-00-SI-RP-C-33301, Version P02, dated 1 June 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.6 metres above Ordnance Datum (AOD) The mitigation measure shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0112151
-
Policy
U0112152CTMP
Development shall not commence until Construction Traffic Management Plan (CTMP) for that phase of development is submitted to and subsequently approved in writing by the Local Highway Authority. The approved plan shall be adhered to throughout the construction phase. I would expect the CTMP to contain information relating to (but not limited to): o Volumes and types of construction vehicles o identification of delivery routes; o identification of agreed access point o Contractors method for controlling construction traffic and adherence to routes o Size, route and numbers of abnormal loads o Swept path analysis (as required) o Construction Period o Temporary signage o Measures to control mud and dust being transferred to the public highway o Timing of deliveries
- Dataset
- Planning condition
- Reference
- U0112152
-
Policy
U0112153Flood Evacuation Plan
Prior to above ground works a Flood Evacuation Plan should be submitted to the Local Planning Authority for approval, once agreed the development shall be carried out in accordance with the plan and each caravan shall have a copy of the plan within it. The Flood Evacuation Plan shall be implemented for the lifetime of the development.
- Dataset
- Planning condition
- Reference
- U0112153
-
Policy
U0112154Construction Hours
Demolition or construction works shall not take place outside 7am to 5pm Mondays to Fridays and 9am to 1pm on Saturdays or at any time on Sundays or Bank Holidays.
- Dataset
- Planning condition
- Reference
- U0112154
-
Policy
U0112166Approved Plans
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans and specifications. Site / location plan. Project number: PQ3329. Drawing number: 03. Date received: 22/06/2023. Existing and proposed plans (Proposals). Project number: PQ3329. Drawing number: 01. Date received: 22/06/2023.
- Dataset
- Planning condition
- Reference
- U0112166
-
Policy
U0112167In accordance with plans specified
The development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: Proposed Plans (Including Site & Location Plan): Drawing No. 001 as received 17/05/2023
- Dataset
- Planning condition
- Reference
- U0112167
-
Policy
U0112172Approved Plans
The development hereby permitted shall be carried out in complete accordance with the details shown on the amended plans referenced and dated as follows: Proposed floor plans and elevations including site plan and location plan. Drawing number: 3664-02J. Date recieved: 20/07/2023.
- Dataset
- Planning condition
- Reference
- U0112172
-
Policy
U0112173External Materials
The external materials to be used in the construction of the extensions hereby approved shall utilise reclaimed limestone and tiles from the demolished areas of the building. Any new limestone, brick, or tile to be used in the development shall match the existing materials.
- Dataset
- Planning condition
- Reference
- U0112173