Search for planning and housing data
3,184 results
Dataset:
-
Legal-instrument
ART4/12/00001Land to the East of Cove Copse Farm
The general effect of the Direction is that planning permission must be obtained for erection, construction, maintenance or alterations of means of enclosure
- Dataset
- Article 4 direction
- Reference
- ART4/12/00001
-
Legal-instrument
ART4/12/00002Land at Rockford Farm
The general effect of the Direction is that planning permission must be obtained for erection, construction, maintenance or alterations of means of enclosure
- Dataset
- Article 4 direction
- Reference
- ART4/12/00002
-
Legal-instrument
ART4/12/00003Land at Rockford Farm
The general effect of the Direction is that planning permission must be obtained for temporary uses and moveable structures
- Dataset
- Article 4 direction
- Reference
- ART4/12/00003
-
Legal-instrument
ART4/12/00004Land to the East of Cove Copse Farm
The general effect of the Direction is that planning permission must be obtained for temporary uses and moveable structures
- Dataset
- Article 4 direction
- Reference
- ART4/12/00004
-
Legal-instrument
ART4/20/00001Land South of A336 Ringwood Road
The general effect of the Direction is that planning permission must be obtained for erection, construction, maintenance, improvement or alteration of a gate, fence, wall or other means of enclosure
- Dataset
- Article 4 direction
- Reference
- ART4/20/00001
-
Legal-instrument
ART4/22/00001New Forest National Park Boundary
The general effect of the Direction is that planning permission must be obtained for any use of land as a temporary campsite unless both of the following apply: The number of pitches at the temporary campsite numbers 50 or fewer and the land was first used as a temporary campsite before 1 March 2020
- Dataset
- Article 4 direction
- Reference
- ART4/22/00001
-
Legal-instrument
ART4/23/00001New Forest National Park Boundary
The general effect of the Direction is that planning permission must be obtained for any use of land as a temporary recreational campsite unless both of the following apply: The land was first used as a temporary recreational campsite before 1 March 2020 and the use of the land as a temporary recreational campsite is for not more than 28 days in total in any calendar year
- Dataset
- Article 4 direction
- Reference
- ART4/23/00001
-
Legal-instrument
ART4/66/00001Bransgore House
The general effect of the Direction is that planning permission must be obtained before erecting, constructing, improving or altering any gates, fences, walls or other means of enclosure; using the land for any temporary purposes, including erecting moveable structures on the land for that temporary purposes; and stationing any caravans on the land
- Dataset
- Article 4 direction
- Reference
- ART4/66/00001
-
Legal-instrument
ART4/72/00001Hovercraft in the Solent
Restricting the use of Hovercraft within approximately one mile of the coast and estuaries taking in Southampton Water, and land within approximately one mile of any point on the Beaulieu and Lymington Rivers up to and including the respective townships
- Dataset
- Article 4 direction
- Reference
- ART4/72/00001
-
Legal-instrument
ART4/73/00001Land at Football Green
The general effect of the Direction is that planning permission must be obtained for building or engineering operations requisite for the use of that land for the purposes of agriculture
- Dataset
- Article 4 direction
- Reference
- ART4/73/00001