Search for planning and housing data

Filters

Typology

Typology

Dataset

1 selected

Dataset

Location

Location

Organisation

Organisation

Period

Period

Entry date

Which date are you interested in?

For example, 27 3 2021

Do you want to see entries since the date or after the date?

Clear

1,303 results

  • ARTICLE 4 DIRECTION MARL/PUDDLE

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for erection, construction, improvement or alteration of a gate, fence, wall or other means of enclosure

  • ARTICLE 4 DIRECTION 97/5

    Legal-instrument

    Directing that permission granted by Article 3 of the said order shall not apply to development specified in Classes IV(2), VI(1) and XXII

  • ARTICLE 4 DIRECTION 97/6

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for the carrying out on the said land of building or engineering operations requisite for the use of that land for the purposes of agriculture

  • ARTICLE 4 DIRECTION NP 12/002

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for erection, construction, maintenance or alterations of means of enclosure

  • ARTICLE 4 DIRECTION NP 12/002#2

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for temporary uses and moveable structures

  • ARTICLE 4 DIRECTION NP NEW FOREST CAMPSITE

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for any use of land as a temporary campsite unless both of the following apply: The number of pitches at the temporary campsite numbers 50 or fewer and the land was first used as a temporary campsite before 1 March 2020

  • ARTICLE 4 DIRECTION NP NEW FOREST RECREATIONAL CAMPSITE

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for any use of land as a temporary recreational campsite unless both of the following apply: The land was first used as a temporary recreational campsite before 1 March 2020 and the use of the land as a temporary recreational campsite is for not more than 28 days in total in any calendar year

  • ARTICLE 4 DIRECTION 97/3

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained before erecting, constructing, improving or altering any gates, fences, walls or other means of enclosure; using the land for any temporary purposes, including erecting moveable structures on the land for that temporary purposes; and stationing any caravans on the land

  • ARTICLE 4 DIRECTION 97/1

    Legal-instrument

    Restricting the use of Hovercraft within approximately one mile of the coast and estuaries taking in Southampton Water, and land within approximately one mile of any point on the Beaulieu and Lymington Rivers up to and including the respective townships

  • ARTICLE 4 DIRECTION 97/2

    Legal-instrument

    The general effect of the Direction is that planning permission must be obtained for carrying out on the said land of works for the excavation and construction of fish farms or agricultural reservoirs on land in the Avon Valley, Hampshire